My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2002 AGN OCT 15 I18
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2002
>
2002 October 15 Agenda Packet
>
2002 AGN OCT 15 I18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 12:52:30 PM
Creation date
2/20/2014 1:17:05 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #18 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF OCTOBER 15, 2002 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER � <br />SUBJECT: AUTHORIZATION REQUEST TO SOLICIT PUBLIC BIDS FOR <br />CONSTRUCTION OF 2002-2003 CDBG STREET IMPROVEMENT <br />PROJECTS #104-25205, #104-26105, #104-27105, 104-23205 AND <br />#104-24105. <br />DATE: OCTOBER 2, 2002 <br />BACKGROUND: <br />The 2002-2003 CDBG Street Improvement Project consists of five (5) different projects. The <br />Project involves asphalt pavement rehabilitation, fill-in concrete curb, gutter and sidewalk, drive <br />approaches, handicap ramps, paving of alleys, and installation of cross -gutters for drainage <br />purposes Currently the City has funding allocations and ECD (Economic and Community <br />Development) approval for these listed CDBG (Community Development Block Grant) Projects. <br />• #104-25205 — Street improvement of Walters, Monroe, Vermont, Fur, Penn and <br />Miller <br />• #104-26105 — Street improvement of Shasta, Scenic, Virginia, Florence, Iowa, <br />Western, Kansas and Illinois <br />• #104-27105 —Street improvement of 3rd 4`n 5`n 6s', 7U', K, L, M and N <br />• #104-23205 — Alley improvement on Shasta/C St., C/D St. and D/E St. <br />• #104-24105 — Alley improvement on Mt. Vernon to 13`n St. between E/F St., F/G <br />St. and G/H St. <br />ANALYSIS/DISCUSSION: <br />Engineering Department opted to combine these five (5) projects into one to minimize construction <br />overhead, mobilization and traffic control expenses. The bidding process has been scheduled for <br />four (4) weeks, and construction time is expected to take approximately three (3) months. <br />During this time, every attempt will be made by the Engineering Department staff to ensure a wide <br />range of potential Bidders are reached by the advertising process. The City will advertise in four (4) <br />local newspapers and in several Plan Houses where Contractors can view Plans, Specifications & <br />Documents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.