My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN APR 15 I13
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 April 15 Agenda Packet
>
2003 AGN APR 15 I13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 1:03:41 AM
Creation date
2/20/2014 1:37:41 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #13 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR CITY COUNCIL MEETING OF APRIL 15, 2003 <br />TO: HONORABLE MAYOR AND MEMBERS OF THE CITY COUNCIL <br />FROM: THOMAS K. CLARKE, ELECTRIC UTILITY DIRECTOR'-rl�C� <br />SUBJECT: REQUEST TO ACCEPT PERMANENT EASEMENT FROM DONALD <br />AND CHARLOTTE MARLOW FOR CONSTRUCTION, OPERATION, <br />AND MAINTENANCE OF AN ELECTRIC POWER TRANSMISSION <br />LINE <br />DATE: April 07, 2003 <br />BACKGROUND: <br />The Engineering, Procurement, and Construction (EPC) agreement for the Agua Mansa Power Plant was approved <br />by Council on May 21, 2002. Acquisition of right of way dedications for a transmission line corridor for the power <br />plant is required across several parcels of property adjacent to and near the Beckett property. <br />DISCUSSION/ ANALYSIS: <br />The necessary grant of easement for Assessor Parcel Numbers 0260-072-01, owned by Donald and Charlotte <br />Marlow was prepared by Best, Best, and Krieger. The property description was prepared by KCT Consultants, Inc., <br />a civil engineering firm retained by EI Colton, the developer of the Agua Mansa Power Plant. The proposed grant of <br />easement and a legal description of the property is attached as Exhibit "A" and "A-1". <br />FINANCIAL IMPACT: <br />The City of Colton has offered $2.00 per square foot to Donald and Charlotte Marlow for the easement. The total <br />cost to the City is $32,500. Sufficient funds are available; bond money dedicated to the construction of the power <br />plant will be used. <br />ENVIRONMENTAL IMPACT: <br />All items relating to the Environmental Impact Report and the requirements of CEQA have been satisfied for this <br />project. <br />RECOMMENDATION: <br />Staff recommends that Council accept, on behalf of the City of Colton, the grant of easement by Donald and <br />Charlotte Marlow, Inc. as presented. Staff also recommends that the easement be duly submitted to the San <br />Bernardino County Recorder's Office for official recordation. <br />Attachment: Exhibit "A" and "A-]" <br />REVIEW TEAM ONLY <br />City Attorney: Finance Director: <br />City Manager: OTHER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.