My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN AUG 05 I23
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 August 5 Agenda Packet
>
2003 AGN AUG 05 I23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:35:04 PM
Creation date
2/20/2014 2:05:27 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON Item #23 <br />AGENDA REPORT <br />FOR THE AUGUST 5, 2003 <br />TO: Honorable Mayor and City Council <br />FROM: Dilu De Alwis, Finance Director <br />SUBJECT: Approval of Contract with Sidewalk Strategies <br />DATE: July 28, 2003 <br />Rankarnund- <br />During the past two years, the City has taken several steps toward overall financial restructuring. <br />This was necessary primarily due to State's budget crisis as well as significant increases in PERS <br />rates. These steps have included departmental reorganizations, expenditure reductions in various <br />areas, increased cash flow monitoring, increased revenue generation where possible, formation of a <br />formal fiscal management committee as well as, most recently, layoffs/job-elimination affecting <br />approximately 40 positions. Even after implementation of the above steps, it remains clear that <br />beginning in 2004-05 the City will need approximately $3 million per year in additional General Fund <br />revenues in order to maintain the existing levels of service in the areas of public safety, parks and <br />recreation and library as well as the numerous other services paid for by the General Fund. <br />As the City works toward getting its house in order, the State is still struggling with its own budget <br />crisis. It is only a matter of time before effects of the State's budget are significantly felt at the local <br />level. Staff addressed the need for a significant revenue increase during its 2003-04 budget <br />presentation. Thus, staff has been exploring the possibility of a revenue generating measures, <br />including a utility users tax (UUT). <br />Dis - issri� ion/ Analycis• <br />Consultant will evaluate Colton's present financial situation and make recommendations for <br />additional finding sources. They will work with our legal counsel and finance staff to determine <br />appropriate revenue enhancements and assist city with building public awareness of our city's needs <br />by designing and implementing a public information program including, if necessary, obtaining public <br />input. Consultant will coordinate the activities (if needed) of other consultants regarding <br />demographic, public research and financial advisory services. Consultant will further provide the city <br />with written recommendations on financing/electoral options including, without limitation, tax rates <br />and type of revenue measure and the related ballot language. <br />A vital part of the success of any ballot measure is the initial research component of the project. This <br />should include a demographic study, public opinion polling, communication with stakeholders and the <br />public as well as other information gathering techniques deemed necessary to craft a successful <br />revenue measure. <br />Staff interviewed and received proposals from three firms that have experience in this area. All three <br />
The URL can be used to link to this page
Your browser does not support the video tag.