Laserfiche WebLink
FINANCIAL/F'ISCAL IMPACT: <br />There will be net reduction in the contract price with removal of pipeline from the contract. <br />However there may be cost incurred by the contractor to order the pipeline. There are funds <br />available in contingencies to cover their costs. <br />RECOMMENDATION: <br />Staff respectfully recommends that Council authorize to defer construction of Optional Bid Item #1 <br />(Relocation And 48" Upsize Of Transmission Water Line) of EDA Project No. 07-01-05132 — <br />Construction of Infrastructure Improvements to Serve the Cooley Ranch Area to November of <br />2003. <br />Report prepared by Victor Ortiz - Engineering Dept. <br />REVIEW TEArW ONL /'� - <br />Ci Attorney: Finance Director:' <br />City Manager: t" — OTHER: <br />