My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN JUL 01 I05
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 July 1 Agenda Packet
>
2003 AGN JUL 01 I05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 3:57:52 PM
Creation date
2/20/2014 2:03:31 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCIAL/F'ISCAL IMPACT: <br />There will be net reduction in the contract price with removal of pipeline from the contract. <br />However there may be cost incurred by the contractor to order the pipeline. There are funds <br />available in contingencies to cover their costs. <br />RECOMMENDATION: <br />Staff respectfully recommends that Council authorize to defer construction of Optional Bid Item #1 <br />(Relocation And 48" Upsize Of Transmission Water Line) of EDA Project No. 07-01-05132 — <br />Construction of Infrastructure Improvements to Serve the Cooley Ranch Area to November of <br />2003. <br />Report prepared by Victor Ortiz - Engineering Dept. <br />REVIEW TEArW ONL /'� - <br />Ci Attorney: Finance Director:' <br />City Manager: t" — OTHER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.