My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 AGN JUN 17 I29
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2003
>
2003 June 17 Agenda Packet
>
2003 AGN JUN 17 I29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 3:57:30 PM
Creation date
2/20/2014 2:03:19 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCIAL/FISCAL IMPACT: <br />There will be net reduction in the contract price with removal of pipeline from the contract. <br />However there may be cost incurred by the contractor to order the pipeline. There are funds <br />available in contingencies to cover their costs. <br />RECOMMENDATION: <br />Staff respectfully recommends that Council authorize to remove Optional Bid Item #1 (Relocation <br />And 48" Upsize Of Transmission Water Line) from Contract of Matich Corporation for the <br />Construction of EDA Project No. 07-01-05132 — Construction of Infrastructure Improvements to <br />Serve the Cooley Ranch Area, in the amount of $444,444. <br />Report prepared by Victor Ortiz - Engineering Dept. <br />REVIEW TEAM ONLY <br />City Attorney: 1( � Finance Director: Ql" in <br />City Manager:7). ?Clh'� OTHER: _� <br />
The URL can be used to link to this page
Your browser does not support the video tag.