Laserfiche WebLink
FINANCIAL/FISCAL IMPACT: <br />There will be net reduction in the contract price with removal of pipeline from the contract. <br />However there may be cost incurred by the contractor to order the pipeline. There are funds <br />available in contingencies to cover their costs. <br />RECOMMENDATION: <br />Staff respectfully recommends that Council authorize to remove Optional Bid Item #1 (Relocation <br />And 48" Upsize Of Transmission Water Line) from Contract of Matich Corporation for the <br />Construction of EDA Project No. 07-01-05132 — Construction of Infrastructure Improvements to <br />Serve the Cooley Ranch Area, in the amount of $444,444. <br />Report prepared by Victor Ortiz - Engineering Dept. <br />REVIEW TEAM ONLY <br />City Attorney: 1( � Finance Director: Ql" in <br />City Manager:7). ?Clh'� OTHER: _� <br />