Laserfiche WebLink
DATE: DECEMBER 10, 2002 <br />FROM: AMER JAKHER, P.E., CITY ENGINEER <br />CITY OF COLTON <br />650 N. LA CADENA DRIVE <br />COLTON, CA 92324 <br />TO: TERRA-CAL CONSTRUCTION, INC. <br />14530 JOANBRIDGE STREET <br />BALDWIN PARK, CA 91706 <br />ENGINEERING DEPARTMENT <br />CHANGE ORDER #2 <br />MOUNT VERNON AVENUOE <br />STREET IMPROVEMENTS & LANDSCAPED MEDIANS PROJECT <br />CHANGE ORDER # 2: INSTRUCTIONS TO THE CONTRACTOR AT THE REQUEST.OF THE CITY ENGINEER <br />INCREASE QUANTITY: <br />ITEM NO. 13 CONSTRUCT 4" A.C. PAVEMENT ON 3" CLASS II BASE <br />3,686.5 S.F@ $3.20/EA = $11,796.80 <br />ITEM NO. 22a REMOVE EXISTING SIDEWALK AND CONSTRUCT A <br />HANDICAP RAMP <br />4 PC @ $1,000/EA <br />= $ 4,000.00 <br />ADDITIONAL ITEMS: <br />1. TRAFFIC CONTROL <br />38 DAYS @ 359.87/DAY <br />= $13,675.06 <br />2. SEWER LATERAL REPAIRS (STENNIS PLUMBING) <br />L.S. <br />= $ 3,291.57 <br />3. MANDRELLING OF THE ELECTRICAL CONDUITS <br />L.S. <br />= $ 8,840.00 <br />4. MOBILIZATION <br />L.S. <br />= $ 27,401.94 <br />NET CHANGE TO CONTRACT: $69,005.37 <br />