Laserfiche WebLink
Item #19 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF AUGUST 03, 2004 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: Jeannette Olko, Electric Utility General Manager <br />SUBJECT: Request for Approval of Reimbursement Agreement with PARGEN, <br />LLC <br />DATE: July 26, 2004 <br />BACKGROUND: <br />The Agua Mansa Power Plant was originally conceived as a combined cycle generating facility, <br />but was built as a simple cycle plant because it was more cost-effective. A combined cycle <br />generating facility will allow the plant to operate more efficiently by reducing the heat rate output of <br />the turbine. This in turn reduces the cost of energy, and enormously helps to optimize the plant. <br />The City of Colton Electric Utility received an unsolicited bid from PARGEN, LLC to build out the <br />Agua Mansa Power Plant to a combined cycle generating facility by adding a second turbine and <br />a heat recovery steam generator. <br />DISCUSSION/ANALYSIS: <br />The proposal received from PARGEN, LLC offers to design, build, and own a second natural gas <br />turbine and steam turbine sited next to the existing turbine owned by the City. As part of the <br />proposal, and because it is in the best interests of both parties, a technical assessment study <br />needs to be performed to verify costs and performance estimates of the combined cycle plant. <br />Both the City and PARGEN, LLC have agreed to participate equally in the costs of the technical <br />assessment study. Therefore, the City and PARGEN, LLC have agreed to enter into a <br />reimbursement agreement whereby PARGEN, LLC will reimburse the City for half of the costs of <br />the study. Through an informal bid process, Black and Veatch was selected as the vendor to <br />conduct the technical assessment study. The Professional Services Agreement with Black and <br />Veatch is for an amount not to exceed $50,000; therefore the reimbursement amount the City will <br />receive from PARGEN, LLC will not exceed $25,000. <br />FINANCIAL IMPACT: <br />There is a positive impact to the City, as the City will be reimbursed for half of the costs incurred <br />for the technical assessment performed by Black and Veatch. <br />ENVIRONMENTAL IMPACT: <br />None. <br />CONFLICT OF INTEREST — Gift Disclosure Requirements <br />PARGEN, LLC <br />30842 Steeplechase Dr. <br />San Juan Capistrano, CA 92675 <br />