My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004 AGN DEC 07 I19
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2004
>
2004 December 07 Agenda Packet
>
2004 AGN DEC 07 I19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 8:55:41 PM
Creation date
2/20/2014 1:41:23 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item #19 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF DECEMBER 7, 2004 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., CITY ENGINEER C <br />SUBJECT: FINAL ACCEPTANCE/NOTICE OF COMPLETION FOR <br />CONSTRUCTION OF COLTON MIDDLE SCHOOL SOCCER FIELD <br />LIGHTING PROJECT — MEI ELECTRIC, INC. <br />DATE: <br />NOVEMBER 23, 2004 <br />BACKGROUND: <br />On January 20, 2004, the City council authorized the award of contract for the construction of <br />Colton Middle School Soccer Field Lighting Project to MacKenzie Electric, Inc. (MEI Electric, <br />Inc.) in the amount of $366,700. The scope of work for the project included the installation of light <br />poles and foundations, lighting fixtures, conduits, wirings and all the necessary control panel and <br />switchgear. The City of Colton has a Joint Use Agreement with Colton Unified School District to <br />construct improvements to the existing playfields located at Colton Middle School. <br />ANALYSIS/DISCUSSION: <br />The contractor has completed the scope of work as specified in the plans and contract documents. <br />The project commenced on April 23, 2004 and was completed on July 30, 2004. Final illumination <br />test of the project was performed on September 9, 2004. <br />MEI Electric, Inc. completed the construction of the project in the amount of $366,700. This project <br />incurred additional expenses for inspection as part of DSA (Department of State Architect) <br />requirements with the following breakdown: <br />a. Material and Welding Inspection $ 5,325.00 Inland Inspection & Consulting <br />b. Concrete Batch Inspection $ 528.00 Inland Inspection & Consulting <br />c. DSA Approved Site Inspector $ 2,600.00 Prestige Inspection Services <br />d. Soil Foundation Inspection $ 720.00 Global Geo -En ing eering <br />Total $ 9,173.00 <br />ENVIRONMENTAL IMPACT: <br />The Notice of Exemption for this project was filed on December 4, 2001. <br />
The URL can be used to link to this page
Your browser does not support the video tag.