My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004 AGN JAN 20 I10
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2004
>
2004 January 20 Agenda Packet
>
2004 AGN JAN 20 I10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 8:58:46 AM
Creation date
2/20/2014 2:19:40 PM
Metadata
Fields
Template:
General Documents
Created By
sespinoza
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: NOVEMBER 15, 2004 <br />FROM: AMER JAKHER, P.E., PUBLIC SERVICES DIRECTOR <br />CITY OF COLTON <br />TO: INTERNATIONAL PAVEMENT SOLUTIONS, INC. <br />PO BOX 10458 <br />SAN BERNARDINO, CA 92423 <br />PUBLIC SERVICES/ENGINEERING <br />CHANGE ORDER #1 <br />RESIDENTIAL MISSING LINK PROJECT <br />INSTRUCTIONS TO THE CONTRACTOR AT THE REQUEST OF THE CITY ENGINEER: <br />- additional earthwork due to change in design <br />- install sidewalk drain on D and 11th Street <br />- Increase in quantities of concrete and AC removal, 6" and 8" concrete curb & gutter, sidewalk, <br />drive approach, cross gutter, relocate mailbox, and adjust water meter to grade. <br />- Decrease in quantity of chain link fence relocation, AC match -up paving, handicap ramps and <br />4" thk. class II base <br />These modifications are based upon site requirement for the completion of the project. <br />I. INCREASED QUANTITY <br />Item No. Description of Work <br />Quantity <br />Unit <br />Unit Cost <br />Total Cost <br />4 <br />REM. CONC. CURB, GUTTER, SW & DW <br />11.69 <br />CY <br />25.00 = <br />292.25 <br />5 <br />REM. & DISP. EXISTING AC PAVEMENT <br />168.47 <br />CY <br />15.00 = <br />2,527.05 <br />8A <br />8" CURB & GUTTER PER STD 106/106A <br />785.00 <br />LF <br />15.25 = <br />11,971.25 <br />8B <br />6" CURB & GUTTER PER STD 107 <br />488.00 <br />LF <br />16.50 = <br />8,052.00 <br />8C <br />5' WIDE SIDEWALK PER STD 109 <br />3,750.75 <br />SF <br />2.40 = <br />9,001.80 <br />8D <br />DRIVE APPR. PER STD 110/110A/110B <br />2,768.75 <br />SF <br />4.00 = <br />11,075.00 <br />8E <br />ALLEY INT. X -GUTTER PER STD 105 <br />1,074.00 <br />SF <br />5.75 = <br />6,175.50 <br />8F <br />STREET INT. X -GUTTER PER STD 112 <br />2,184.50 <br />SF <br />5.75 = <br />12,560.88 <br />11 <br />ADJUST W/M BOX COVER TO GRADE <br />23.00 <br />EA. <br />35.00 = <br />805.00 <br />CHANGED DESIGN SW-1200BL. FAIRVIEW <br />1.00 <br />LS <br />3500.00 = <br />3,500.00 <br />INST. SIDEWALK DRAIN ON C STREET <br />1.00 <br />LS <br />1500.00 = <br />1,500.00 <br />SUB -TOTAL <br />= <br />$ 67,460.73 <br />II. DECREASED QUANTITY <br />Item No. Description of Work <br />Quantity <br />Unit <br />Unit Cost <br />Total Cost <br />6 <br />REMOVE & RELOCAT EXIST. CL FENCE <br />570 <br />LF <br />21 = <br />11,970.00 <br />7 <br />AC MATCH -UP PAVEMENT <br />86.42 <br />SF <br />97.50 = <br />8,425.95 <br />9A <br />HR W/ EXIST. CURB (NEEDS CURB -CUT) <br />8 <br />EA. <br />950 = <br />7,600.00 <br />9B <br />HR W/O CURB OR CURB & GUTTER <br />4 <br />EA. <br />800 = <br />3,200.00 <br />9C <br />HR WITH EXISTING CURB DEPRESSION <br />4 <br />EA. <br />800 = <br />3,200.00 <br />10 <br />REMOVE AND RELOCATE MAILBOX <br />5 <br />EA. <br />65 = <br />325.00 <br />13 <br />INSTALL 4" CLASS II BASE UNDER AC <br />100 <br />TONS <br />15 = <br />1,500.00 <br />SUB -TOTAL <br />= <br />$ (36,220.95) <br />TOTAL AMOUNT <br />FOR CHANGE ORDER NO. 1 <br />$ 31,239.78 <br />File: CHANGE ORDER NO 1 Page 1 of 2 Date Printed: 11/29/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.