My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN APR 19 I15
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 April 19 Agenda Packet
>
2005 AGN APR 19 I15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 11:18:59 AM
Creation date
2/20/2014 1:58:52 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Also, in prior years, assessments have not been levied in Zone 3. With the construction of new <br />local improvements, staff is proposing the levy of assessments in Zone 3. A base assessment of <br />$53.40 per EBU is being proposed for Zone 3(a 3% increase would provide for a$55.00 per EBU <br />assessment). <br />Assessments levied, per EBU, for services similar to those provided under the City of Colton's <br />LLMD 1, in the surrounding area are as follows: <br />City of Fontana $250.00 for a specific benefit zone <br />City of Temecula $63.44 for city-wide arterial roadway landscaping, plus $20 to $225 for <br />landscaping within a specific benefit zone <br />City of Perris $51.08 to $470.56 ($144.90 mid-range) within a specific benefit zone <br />City of Corona $65.00 to $714.00 within a specific benefit zone <br />City of Rialto $58.00 to $278.00 ($168.00 mid-range) within a specific zone. <br />The California Constitution requires that assessment ballots for any proposed new or increased <br />assessment be mailed to property owners. If required, ballots will be mailed no later than May 7`n <br />and will be tabulated following the close of the June 215` public hearing. An informational public <br />meeting will be held on June 7�' to provide the property owners an additional opportunity to voice <br />any concerns or questions. <br />The assessment ballot tabulation will be made for both in support of and in opposition to the <br />proposed new and/or increased assessment with the ballots being weighted in accordance with <br />the total number of EBUs for each zone. In the event that the assessment ballots in opposition <br />exceed those in suppoR, there will be a"majority protesY', and the City Council will be precluded <br />from proceeding with the proposed new and/or increased assessments. In the event that <br />assessment ballots in support exceed those in opposition, the City Council can proceed with the <br />proposed new and/or increased assessments. <br />FINANCIAL IMPACT: <br />With an annual increase in the assessments, the intent is for LLMD 1 to be self sufficient and not <br />require contributions from the City's General Fund. The total budget projected for fund LLMD 1 for <br />fiscal year 2005(2006 is $419,689.65. Even with a 4% increase in the assessments, in order to <br />continue to provide to same level of service, the General Fund contribution is estimated to be <br />$151,579. With a 3% increase in assessments, the contribution is estimated to be $154,138. It is <br />anticipated that, with an annual increase in the assessments and with future development within <br />the benefit zones, the costs to the general fund will decrease over time. <br />ENVIRONMENTAL IMPACT: <br />Not Applicable. <br />CONFLICT OF INTEREST: <br />None. <br />RECOMMENDATION: <br />Staff recommends approval of the three resolutions: <br />1) Resolution initiating proceedings, <br />2) Resolution of Preliminary approval of the Engineer's Report, and <br />3) Resolution of Intention setting the public hearing forJune 21s`, 2005. <br />Prepared by: Maritza Tapia — Administrative Analyst <br />
The URL can be used to link to this page
Your browser does not support the video tag.