My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN DEC 06 I21
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 December 06 Agenda Packet
>
2005 AGN DEC 06 I21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 8:51:06 PM
Creation date
2/20/2014 4:56:39 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #21 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF DECEMBER 6, 2005 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: AMER JAKHER, P.E., CITY ENGINEER �!) <br />SUBJECT: APPROVE FIRST AMENDMENT TO THE COOPERATIVE <br />AGREEMENT BETWEEN THE CITY OF COLTON AND THE CITY OF <br />RIVERSIDE FOR CENTER STREET EXTENSION PROJECT <br />IMPROVEMENTS. <br />DATE: November 8, 2005 <br />BACKGROUND: <br />On June 1, 2000 the City of Colton entered into an agreement with the City of Riverside to provide <br />improvements along Center Street (Center Street Extension Project). This project's scope of work <br />involves extending Center Street from Main Street to Orange Street. Center Street is designated to <br />be an 88 -foot arterial street, in the future, however at this time only 28 feet of pavement will be <br />constructed, providing two travel lanes. Further improvements to the street will be constructed as <br />adjacent properties are developed. In addition, to the street improvements 12 -inch sewer and <br />water mains will be installed as well as a natural gas main. <br />DISCUSSION/ANALYSIS: <br />Per the original Cooperative Agreement between the City of Colton and the City of Riverside the <br />engineering design will be completed solely by the City of Colton. The preliminary engineering, <br />design plans, specifications and project estimate will be made available and approved by the City <br />of Riverside prior to the Project entering its construction phase. The City of Riverside will be the <br />lead agency for the construction phase of this project. The original agreement stated the project <br />construction costs to be approximately $525,000; the costs would be shared by both cities, the City <br />of Colton's share being 40% and the City of Riverside providing the remaining 60%. <br />The First Amendment to the Cooperative Agreement with the City of Riverside will designate the <br />City of Riverside as the lead agency for right-of-way acquisition and all other matters <br />correspondent to the project. In addition, the project cost has been amended from its original <br />estimate of $525,000 to $1,092,255; the City of Colton will provide 40% of these costs and the City <br />of Riverside will provide 60% of the associated project costs. Currently the original Agreement has <br />defined the project as Center Street between Bartlett Avenue and Orange Street. The First <br />Amendment will correct the location of the project to read: Center Street from Orange Street to <br />Placentia Lane. <br />FINANCIAL IMPACT: <br />The total project costs are estimated at $1,092,255. The City of Riverside will fund 60% <br />($655,353) of the project and the City of Colton will fund 40% ($436,902) of the project costs. The <br />City's local share will be provided by Measure I funds and are available in account 450-0614-6970- <br />3890. <br />7/10/03 City Clerk's Office Cb <br />
The URL can be used to link to this page
Your browser does not support the video tag.