My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN DEC 20 I17
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 December 20 Agenda Packet
>
2005 AGN DEC 20 I17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 2:55:45 PM
Creation date
2/20/2014 4:59:22 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #17 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF DECEMBER 20, 2005 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: Jeannette Olko, Electric Utility General Manager <br />SUBJECT: Award of Bid for Various Transformers, Item #1 to Pauwels <br />Transformers in the Amount of $5,071.79, Items #2, #5, #6 and <br />#7 to Utility Products Supply in the Amount of $88,530.64, and <br />to Reject All Bids for Items #3 and #4. <br />DATE: December 12, 2005 <br />BACKGROUND: <br />The City purchases transformers into Electric Stores inventory when the need arises to upgrade, <br />replace, or install a new transformer for an Electric customer. The City also orders back-up <br />transformers to be used to replace a transformer that goes bad in the system. Back-up <br />transformers are necessary, due to the long delivery time. Because of recent hurricanes in the <br />gulf states, lead times have increased significantly for many transformer manufacturers. In the <br />past, transformer lead times ranged from 4-10 weeks. <br />At this time, the Electric Utility needs to purchase various pad mount transformers to be used for <br />back-up and also for new development projects in progress. <br />DISCUSSION/ANALYSIS: <br />On November 15, 2005, the Electric Department posted a Notice Inviting Bids for these <br />transformers. Bid packages were mailed to six suppliers of distribution transformers. A bid <br />opening was held at 2:00 P.M. on December 6, 2005 at the Electric Department Administrative <br />offices. Five bids were received and evaluated, with Southwest Power submitting two bids from <br />different manufacturers. <br />A Bid Analysis is attached showing the price and delivery quoted by each vendor. The <br />recommended vendor's price is underlined for each size transformer. The total of bid award is <br />listed at the bottom for the recommended vendor. <br />Also attached is a Transformer Load Loss Evaluation. This evaluation shows the life cycle cost of <br />the transformer over its useful lifetime, using a combination of loss calculations supplied by the <br />transformer manufacturer and the unit price quoted by the vendor. To evaluate the lowest cost <br />bid, the life cycle costs demonstrate the cost of the transformer over its "in-service" life, taking into <br />consideration the degradation over time. The transformer that loses the least over the useful life <br />results in the lowest cost of the equipment. It is a function of which manufacturer has the least <br />loss. <br />
The URL can be used to link to this page
Your browser does not support the video tag.