My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2005 AGN FEB 01 I03
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2005
>
2005 February 01 Agenda Packet
>
2005 AGN FEB 01 I03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 2:26:11 PM
Creation date
2/20/2014 1:40:23 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Agendas
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOURTH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT <br />BETWEEN THE CITY OF COLTON APPROVED BY <br />AND CITY CO NCIL <br />ate <br />MICHAEL BRANDMAN ASSOCIATES It#�_ <br />FOR THE <br />PACIFIC RAIL PROJECT <br />THIS FOURTH AMENDMENT TO THE CITY OF COLTON PROFESSIONAL <br />SERVICES AGREEMENT WITH MICHAEL BRANDMAN ASSOCIATES FOR THE PACIFIC <br />RAIL PROJECT ("Fourth Amendment") is entered into this 1" day of February, 2005 between the <br />City of Colton ("City"), a California municipal corporation, and Michael Brandman Associates a <br />California corporation ("Consultant"). City and Consultant are sometimes herein referred to <br />collectively as the "Parties." <br />RF,CTTATS% <br />WHEREAS, City and Consultant entered into that certain Professional Services <br />Agreement for environmental review services on September 3, 2002 ("Original Contract") <br />wherein the City granted Consultant a contract to perform environmental review services for the <br />Pacific Rail Industries Metal Shredder Facility (the "Project"); and <br />WHEREAS, the City has previously approved three minor budget augment revisions to <br />the Original Contract to address additions to the scope of work including: (1) an augment <br />authorized on December 18, 2002 in the amount of $954.00 to conduct an air toxics assessment; <br />(2) an augment on January 13, 2003 in the amount of $5,645.00 for the commission of a Phase I <br />Environmental Site Assessment; and (3) an augment on April 21, 2003 in the amount of $330.00, <br />authorizing Consultant to perform air quality revisions to their environmental analysis required <br />by the Project changes made by the applicant; and <br />WHEREAS, on June 3, 2003, the City approved a First Amendment to the Original <br />Contract which authorized a $46,034.00 budget augmentation to pay for Consultant costs to <br />address changes in the scope of the Project and the environmental documents made by the <br />Applicant, including the addition of transloading and additional storage activities proposed for <br />the Project; and <br />WHEREAS, on February 17, 2004, the City approved a Second Amendment to the <br />Original Contract which authorized a $28,000.00 budget augmentation to pay for Consultant <br />costs for work not included in the scope of work, including: (1) preparation and circulation of <br />Second Administrative Draft EIR, (2) resolution of environmental issues, especially air quality <br />and noise issues, which require investigation and consultation; (3) revisions to the air quality <br />study; and (4) supplemental noise monitoring of existing noise levels at the Project boundaries; <br />and <br />RVPUB\MXM\652695 <br />
The URL can be used to link to this page
Your browser does not support the video tag.