My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1997 SPE MIN MAR 26
Colton
>
CITY CLERK
>
City Council Minutes
>
1991-2000
>
1997
>
1997 SPE MIN MAR 26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 4:17:40 PM
Creation date
2/20/2014 12:48:43 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Li - Pro ater Bond and Rate In <br />sludly, susI!Q 2osedW� e <br />as <br />Tom Clarke, Utilities Director, asked -for direction from Council on the fionnat of the presentation. <br />Lep-al Counsel Sabo advised that questions regarding the basis and reas€ n. for the public hearing and <br />procedural issues could be discussed at this time but no action would be taken as a public hearing had <br />-been set for April I". <br />Discussion followed with direction to staff that clarification regarding thefollowing items be <br />included as part of the Public fearing presentation scheduled for April 1, 1997- <br />1. . Describe input the Utilities Corn.n.ussion. has had in the whole proposal. <br />2. Provide inforryiation that the proposal is based on the Water Master Plan.. <br />3. Requested that Krieger & Stewart, consullarits, be available at the meeting and be prepared to <br />answer questions. <br />4. Direct Krieger &I Stewart to explain. theIr -use of ani inflationary factors in increasing any of the <br />original 1991 -figures to meet today's construct -ion. cost and explain how the factors were <br />integrated in the formula. <br />5. Report on the current conditions of our facilities and what the reliability rates are now as they are <br />projected out and -what the real need is based upon failures that have occurred and prcjected to <br />occur, and the anticipated cost, <br />-es an <br />6. List costs of system f -es which have been paid out over the years d the cost analysis. <br />7. Proved the law- which. requires that a Five -Year Master Plan be updated every five years for <br />Public Water Districts and Agency Districts. <br />& On the bond being issued by FARECAL describe what Happens to the monies not applied to the <br />actual construction, <br />Tom. Clarke offered clarification in the following areas: <br />A, The 1997 Master Plan is not complete, Staff s recommendations are a. result of tti.e 1.991 Master <br />Plan that was presented but never acted upon in full scale. Some of the projects were started, <br />some were deferred. All prqjects have been reviewed by Krieger and Stewart to evaluate (1) the <br />reasonableness of our cost estimates and the S 10 million. program. that staff put together (2) and to <br />make sure those projects conform. with the recommendations that will come out. of the 1997 <br />Master Plan. Staff wanted to make sure that the old data was still valid and the new data was still <br />going to be applied to projects they were going to recommend and that they Concur with our <br />program. in concept and in dollar amount. <br />B. Staff took the 1991 data, updated it to current construction costs, based upon staffs knowledge. to <br />come up with the new cost estimates: then staff took those cost estimates and ran thern by <br />Krieger and Stewart. The consultants agreed with the estimated costs of those projects and <br />z::) <br />indicated the, reservoirs niay be a little high but staff indicated the intangibles the City may run <br />into on the construction. site. The consultants stated that contingencies were built in. Krieger and <br />-nely low on pipeline extension that went under a railroad <br />Stewart believed the City was extrei <br />crossing and further, that the City was a couple of hundred thousand dollars low should it runinto <br />any problems. We believe as a -total program we are balanced. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.