Laserfiche WebLink
1 <br />2 <br />3 <br />4 <br />5 <br />6� <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />i <br />31 <br />32 <br />his o quipa t within the normal working hours of tie, City of its, <br />contractors # for the purpose of obtaining nanoplate data and main <br />necessary physical measurements and cep erati ng tests. <br />() Frequency sensitive utilization equipment of dome n t <br />customers will be surveyed by mail. A letter of instructions will <br />I be addressed to each customer enclosing a survey card listing the <br />more usual types of frequency sensitive domestic appliances. To <br />insure adaptation of his oqupmcnt, the customer must indicate on <br />the survey c ard which appliances he has and write in the name of <br />the manufacturer, brand, model, and year of electric refrigerators, <br />home freezers, was sing machines, rocord playors, and other equipment <br />and shall return the survey card promptly to the City. <br />(u) The surveys of frequency sensitive utilization ®quip <br />Ment of classes of customers other than d omestic will be made dur. <br />ing the normal working hours of the euthorized representatives of <br />the City or its contractors, <br />(4) Representatives of the City and its contractors ene- <br />gaged in then survey will bo provided with credentials for idsntifi.- <br />cation. <br />(E) ENGINMING OF UTILIZATION EQUIPBMT <br />( 1) The data obtained from, the survey of customers ! <br />utilisation equipment will be analyzed by engineers of the City or <br />its contractors, to determine the necessary changes required for <br />adaptation of the equipment to render It capable of performing <br />essentially the same service when supplied from a 60 cycle systemm, <br />as that previously obtained when supplied frorn a 50 cycle system* <br />Frequency :sensitive utilization equipment will be adapted in accorl- <br />f dance with standard conversion procedures as determined by the City <br />Customers will, upon request, be advised of the proposed changes to <br />be made in utili zati nation equipment, <br />(2) Rotating <br />eq A Amen t will <br />require adap to ti on <br />only if <br />it is speed critical and <br />In such ceases <br />mechanical changes <br />will <br />r 5w► <br />