My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res. No. 1281
Colton
>
CITY CLERK
>
City Council Resolutions
>
1944-1973
>
1947
>
Res. No. 1281
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 2:05:16 PM
Creation date
2/20/2014 5:45:00 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 rams timers, alarm systems and time s witabos need not be brought <br />2 to the clock depots, but will be adapted by the Citi', or its con-• <br />3 tractors, on the cus to er a l preptises, or removed to a conversion <br />4 shop* <br />5 (4) In exceptional cases where. clbsks and timing devices <br />6 cannot be adapted for 60 cycle operation at a reasonable coat, be- <br />1 cause of condition, age, Inadequate or obsolete or nonstandard <br />8 destgn, the customer may exchange his 50 eycles clod a s provided <br />9 in Plan 1 a.bo e, or accept the established conversion allowance im <br />10 exchange for his clock. <br />11 (H) O'IRICT COXNRCTFM DRV W M PUW,65 <br />12 (1) The City, or Its contractors, will make, the neeesse <br />13 nary obanges required to adapt direct connected deep well pumps <br />14 for 60 cycle operation,# in accordance with the Cites engineering <br />15 determl.na.t 3 on, or the customer may accept a conversion allowance <br />16in lieu of adaptation, <br />17 (2 ) A survey and pump test will be made by the a Ci to <br />18 provide informet Ton uaefu`i in determining the necessary changes re <br />19 qu!red in the pumping equipzte9nt for 60 Cycle op€tra,tiono The data <br />20 obtained f ron the survey and teem will ba analyzed by engineers o <br />21 the City to determine the necessary changes roqu.ired to render the <br />22 pumpeapable of performing essentially the same service when sup-m <br />23 plied from a 60 cycle system as that previously obtained when sup- <br />24 plied from, a 50 cycle system. The adaptation of the pssbping equip <br />25 me►nt will be performed by d estaging of the pump bowl assembly, or <br />26 by trimming the pump impeller. <br />27 (3) The City# or its contractors # will pull, adapt for <br />28 60 cycle operation and reinstall the pup w i thovt cost to the <br />29 customer., provided the pump and th a w ell are in normal operating <br />30 condition, are made available for conversion on. wi thin the establishel <br />31 schedule and the customer executes an agreement, substantially in <br />32 the form entitled *Cue tomer f s order and Agreement to Adapt Funpm <br />ing Equipment for 60 cycle Operation* <br />
The URL can be used to link to this page
Your browser does not support the video tag.