Laserfiche WebLink
CITY OF COLTON <br />ASSESSMENT DISTRICT NO. 77-1 <br />(COOLEY DRIVE, PHASE II) <br />EXHIBIT "A" <br />The work proposed under Assessment District No. 77-1 <br />(Cooley Drive, phase II), is to grade the extension <br />of Cooley Drive, install an underground storm drain <br />system with curb inlets, construction of sewers and <br />sewer laterals, water main, and fire hydrants, street <br />lights, concrete curb and gutter, concrete sidewalks, <br />asphaltic concrete bicycle path and asphaltic con- <br />crete road surfacing. Existing well, lying within <br />the road right-of-way,.will be modified and under- <br />ground electrical will be installed by the Southern <br />California Edison Company and the City of Colton. <br />