9. Brief description of scope of work to be done, and time frame, to briny <br />property to a completed state of preservation: <br />The scope of work will ,'include stabilization, to halt-futher deterioration <br />and enhance safety of the building; preservation, which will include initial <br />stabilization work as well as ongoing maintenance of the historic property; <br />and rehabilitation, in order to return the property, through repair and <br />interior alteration, to an efficient museum use. The anticipated time frame <br />to bring the property to canpleted state of preservation is two (2) years. <br />10. Kind of project proposed for grant funding: <br />Development --restoration X rehabilitation X stabilization X <br />Acquisition <br />11. Major work elements and detailed cost breakdown, in priority order, with <br />dates costs were/will be incurred for any preconstruction work (architec- <br />tural, archeological, structural engineering, acquisition options) incurred <br />between July 1, 1984, and project approval date (after July 1, 1985): <br />WORK ITEM COST DATE INCURRED <br />Structural Engineer Report $500.00 10/80/84 <br />Architectural Report & Plans $7,000.00 <br />see attachment #1 <br />Total cost: $113,000 <br />NOTE: all costs are approximate. <br />12. Amount of grant funds requested with this application: $ c;n,.0.00 <br />(must be no less than $10,000 and no more than $300,0.00) <br />13. Non—state matching share available (must be from 10% to 55% of development <br />project costs, and/or from 45% to 55% of acquisition project costs) as of <br />December 31, 1984 by solidcommitment. (For combination projects, specify <br />match applicable to acquisition and development components.) <br />DONOR SOURCE <br />City of Colton General Fund <br />15 <br />DATE AVAILABLE AMOUNT <br />7/1/85 $5,000 <br />