My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2003 RES R-105-03
Colton
>
CITY CLERK
>
City Council Resolutions
>
2001-2010
>
2003
>
2003 RES R-105-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 9:45:03 AM
Creation date
2/20/2014 12:09:57 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />MEASURE I FIVE YEAR PLAN 1999/2004 <br />YEAR STREET & LIMITS IMPROVEMENT COST EST. <br />2003/04 <br />Barton Road Bridge <br />Bridge replacement <br />$ <br />270,000.00 <br />(Joint agreement with Grand Terrace) <br />2003/04 <br />Street Pavement Rehabilitation Phase 3 <br />Street overlay <br />$ <br />259,474.00 <br />(Districts 1 and 2) <br />2004/05 <br />Washington Street <br />Street Widening <br />$ <br />60,000.00 <br />Bluff Road to Cooley <br />Engineering Design <br />2004/05 <br />Street Pavement Rehabilitation Phase 4 <br />Street overlay <br />$ <br />55,550.00 <br />(Districts 5 and 6) <br />2005/06 <br />Reche Canyon <br />Missing links of curb & gutter <br />$ <br />482,000.00 <br />Washington St to County Line <br />Construction <br />2005/06 <br />Street Pavement Rehabilitation Phase 5 <br />Street overlay <br />$ <br />122,450.00 <br />(Districts 3 and 4) <br />2006/07 <br />Reche Canyon <br />Street Widening <br />$ <br />1,435,000.00 <br />1/2 mile south of Washington Street <br />Construction <br />to County line <br />2006/07 <br />Street Pavement Rehabilitation Phase 6 <br />Street overlay <br />$ <br />100,000.00 <br />(Districts 1 and 2) <br />2007/08 <br />Overlay/Slurry seal Rehabilitation Phase 7 <br />Street overlay/slurry seal <br />$250,000.00 <br />(Districts 5 and 6) <br />2007/2008 <br />Mt. Vernon Avenue <br />Curb/gutter and pavement <br />$ <br />556,442.00 <br />Washington Street to "M" Street <br />Contact: <br />James King Measure I Revenue Estimate (5 Yrs.) <br />$ <br />3,590,916.00 <br />(909) 370-6100 <br />Resolution No. <br />EXHIBIT B <br />
The URL can be used to link to this page
Your browser does not support the video tag.