My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2004 RES R-100-04
Colton
>
CITY CLERK
>
City Council Resolutions
>
2001-2010
>
2004
>
2004 RES R-100-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 10:34:06 PM
Creation date
2/20/2014 1:06:25 PM
Metadata
Fields
Template:
General Documents
Created By
sespinoza
DocType
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Colton <br />MEASURE "I" TWENTY YEAR PLAN 2004/2024 <br />A NARRATIVE <br />The City of Colton General Plan Circulation Element currently identifies proposed <br />improvements of the City Street System for next twenty years. Implementation of <br />these improvements is dependent on rates of development and the availability of <br />funding from a variety of sources, including Measure I funds. Current emphasis is <br />placed on street capacity improvements to accommodate growing traffic volumes as <br />identified in the Five Year Measure I Plan. Colton is a mature City with an <br />extensive existing road system. Pavement management programs are currently <br />implemented to protect this sizable investment. As the City of Colton nears build- <br />out, estimated near the year 2025, roadways constructed with Measure I Funds will <br />also experience a growing need for protective maintenance. Over the next twenty <br />years, the City of Colton will substantially increase the allocation of Measure I <br />Funds for rehabilitation and reconstruction of these existing facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.