My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1989 AGN JUL 18 I04
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1983 - 1989
>
1989
>
1989 July 18 Agenda Packet
>
1989 AGN JUL 18 I04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 9:02:17 AM
Creation date
2/20/2014 6:58:37 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.v I / 1 V /.0.7. <br />'3ED <br />Yo Load <br />Load <br />'Unit Price <br />evaluatedCost <br />MOPEA PWR SYS <br />to Load <br />Load <br />(Unit Price <br />Evaluated Cost <br />3.E., SUPPLY <br />No Load <br />Load11 , <br />Unit, Price <br />jzvaluated Cost <br />PAUWELS TRANS <br />No Load <br />Load <br />Unit Price <br />Evaluated Cost <br />WESCO UTILITY <br />No Load <br />Load <br />Unit Price <br />Evaluated" Cost <br />TRANSFORMER OAD LOSS EVAI,UA ` v <br />'300 KVA 300 KVA <br />SM77/480 S/V120/208 <br />630 635 <br />2055 2450 <br />8045 8110 <br />12526.25 13085.10 <br />642 672 <br />1939 2107' <br />6153 6041 <br />10409.17 10565.73 <br />610 605 <br />1662 1856 <br />7.362 7670 <br />1.1278.74 11827.96 <br />587 599 <br />2401 2361 <br />5786 5.566 <br />10447.17 10194.37 <br />564 529 <br />2085 2.394 <br />5900 6024. <br />10130.45 10553.78 <br />Theaboveevaluation was done on the computer. The formula is used to <br />determine the cost of a transformer over it's lifetime. It takes into <br />consideration the unit price we are paying and the factory calculated <br />no load losses and load losses•. The formula is as followsr <br />The formulas for evaluated total transformer cost.will be as follows: <br />Evaluated Total Cost firm price quoted FOB our Electric Yard <br />including sales tax plus guaranteed average <br />loss cost. <br />Where Guaranteed Average Loss Cost <br />A x guaranteed average no load losses in <br />watts. <br />+ B x guaranteed -average full load losses in <br />watts. <br />Where A $2.40 per watt <br />B = $1.21 per watt <br />In the event that distribution transformers are suppliedwith average losses <br />greater than the values quoted on the bid for these transformers, a penalty <br />will be assessed against the transformer manufacturer for additional cost for <br />added losses, and,penalty will be calculated by this.formula: <br />Penalty = (A.x,excess ,no load losses + B x excess load losses) <br />The penalty, if any, shall be withheld from the final payment. <br />No credit is_given_for having certified losses less than average guaranteed <br />
The URL can be used to link to this page
Your browser does not support the video tag.