Laserfiche WebLink
PLANS <br />1. Reference: Sheet 1 <br />Change:- In the "Quantities" the quantity shown for 2-D184 <br />Manhole shall be changed from 8 to 7. <br />Addition: In the "Quantities" add 11 Each Catch Basins per <br />Standard Drawing No. 200 <br />2. <br />Reference: Sheets <br />4 & 5: <br />Deletion: Delete Manhole at Sta 23 + 24.71. <br />SPECIFICATION <br />1. Reference: Proposal Bidding Schedule, Page 11 <br />Deletion: Delete Page 11, "Proposal Bidding Schedule," in <br />its entirety. <br />Addition: Add new Page ll, "Proposal Bidding Schedule" <br />enclosed with this Addendum. <br />i <br />2. Reference: Section 11 - SPECIAL CONDITIONS - PAGE 57 <br />Addition: Following Subsection 11.14, add the following: <br />11.15 Special Junction Structure <br />Special Junction Structure shall be constructed in <br />accordance with the details shown on Sheets 2 and 3 of <br />these specifications. from the SBCFCD, and <br />the Plans, the. requirements of Permit <br />Concrete construction �� <br />hall conform <br />to Section 201 Concrete, <br />Mortar, and Related Material," and Section 303 "Concrete <br />Masonry Construction" of the Standard Specifications. <br />The lump sum bid for the special junction structure shall <br />include the cost of materials and installation cost for the <br />concrete collar at Sta 0+80 Sheet 3 '10er detail on Sheet 2 of <br />the Plans. <br />�I <br />Page 2 of 2 <br />Addendum No. 1 <br />August 25, 1988 <br />