Laserfiche WebLink
Shook -Building Systems Inc. <br />April 17, 1990 <br />City of Colton <br />630 K. La Cadena Drive <br />Colton, California 92324 <br />Attention: David Taylor <br />Reference: Hutton/Luque Ceiling Revision <br />Dear David: <br />i <br />As requested the preliminary estimate for the ceiling revisior <br />as per drawings and information given to us will be as <br />follows: <br />1,. Ceiling. . .No Change Push <br />2. H.V.A.C. 18,000.00 <br />3. Electrical : 4 6 . . . . . . . . . . . . 11,699.00 <br />4. Partition Removal. , 1,000.00 <br />S. Supervision. . . . . 29800.00 <br />Sub Total. . . . . . 339499.00 <br />12% Contractor's Fee 4,020.00 <br />TOTAL. .` 37, 519.00 <br />This work will require adding approximately two (2) weeks <br />to the schedule. The Hutton Building will be approximately <br />$23,671.00. Luque Building will be approximately $13,848.99. <br />Respectfully submitted, <br />SHOOK BUILDING SYSTEMS, INC. <br />Nick Capriotti <br />Project Kanager <br />shs <br />LIC. NO. 263001 <br />8(1TLE'R <br />BUILDER <br />2055 SOUTH BAKER AVE. • ONTARIO, CALIFORNIA 91761 • (714) 947.5817 <br />ci_0=9Z_if+C-h+T1 :M1 -1a1 1C1.�-- CIM TrrITna \4nnu(z:n? hT.:>?T 119,-J.T-J.-ir4 .. �. <br />