My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1990 AGN NOV 20 I03
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1990
>
1990 November 20 Agenda Packet
>
1990 AGN NOV 20 I03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 5:09:37 PM
Creation date
2/20/2014 7:04:07 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />For Council Meeting of November 20. 1990 <br />TO: Honorable Mayor and City Council 11 <br />FROM: EDMUND F. SOTELO, City Manage jo� <br />SUBJECT: Award of Bid for Various Transformers to Date' November 14, 1990 <br />Pauwels Transformers in the Amount of $9,814.60 and <br />WESCO Utility in t-hP Amrnint- of $17,189 58 <br />RArYnRC umn <br />Utility transformers are ordered into Electric Stores inventory as <br />required. The quantity and sizes are projected by the City Electrical <br />Engineer as plans are submitted for new development and replacement <br />transformers are needed. <br />On October 18, 1990, General Services advertised for sealed bids for <br />some of these requirements. Bid opening was held at 2:30 p.m., November 5, <br />1990, in the General Services office. Four bids were received and <br />evaluated. <br />STATEMENT OF THE PROBLEM <br />None <br />ALTERNATIVES <br />None <br />FINANCICAL IMPACT <br />A Bid Analysis is attached showing price and delivery quoted by each <br />vendor, with the recommended vendor's price underlined for each trans- <br />former. The total of bid award is listed at the bottom for each vendor. <br />Also attached, is a Transformer Load Loss Evaluation, which was done on <br />the computer. This evaluation shows the true cost of the transformer <br />over it's lifetime, using a combination of load calculations supplied <br />by the transformer manufacturer and unit prices quoted by the vendor. <br />The result of this evaluation determines the recommended vendor. The <br />lowest evaluated cost for each transformer is underlined. <br />ENVIRONMENTAL IMPACT <br />None <br />Attachments: ( 2 ) Bid Analysis <br />Transformer Load Loss Evaluation <br />Page 1 of___2 _ Item No. f-3 <br />IL <br />
The URL can be used to link to this page
Your browser does not support the video tag.