My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1992 AGN APR 07 I19
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1992
>
1992 April 07 Agenda Packet
>
1992 AGN APR 07 I19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 10:14:10 AM
Creation date
2/20/2014 7:16:16 PM
Metadata
Fields
Template:
General Documents
Created By
jshook
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KRIEGEI� INCORPORATED • ENGINEERING CONSULTANTS <br />_0MEWt1RT 3602 University Av • Riverside, CA 92501 • Tel 714-684-6900 • Fax 714-369-5026 <br />March 19, 1992ell <br />John C. Hutton, Director of Public Works, v <br />City of Colton <br />650 N. La Cadena Drive <br />Colton, CA 92324 �� 6 <br />Subject: Lake Cadena Lift Station Remediation (Schedule D) <br />Recommendation of Acceptance of Contract Work <br />Dear Mr. Hutton: <br />312-29.3.4 <br />Albert W. Davies, Inc. has completed the Contract work for subject project and the adjusted <br />Contract amount for same is set forth as follows: <br />Original Contract: $328,800.00 <br />Contract Change Order No. 1: 0.00 <br />Contract Change Order No. 2: 17,598.97 <br />Adjusted Contract: $346,398.97 <br />Contract Change Order No. 1 is attributable to changing the telemetry equipment manufacturer for <br />the Lake Cadena Lift Station to ensure equipment compatibility with the City's main telemetry <br />computer system. Contract Change Order No. 2 is attributable to: (1) changing pipe material at the <br />sewer/water crossing at Agua Mansa Road and Rancho Avenue, (2) changing new sewage force <br />main alignment since location of existing force main differed substantially from record drawing <br />data, and (3) extending Contract time due to delays encountered in the manufacture and delivery of <br />non -clog pumping units. <br />Project was operational and essentially completed by October 28, 1991, the adjusted Contract <br />Completion Date. Recommendation of acceptance has been delayed pending completion of all <br />"punch list" work items. <br />Because the Contract work has been completed in accordance with Contract Documents (including <br />all "punch list" work items), Krieger & Stewart recommends acceptance of said work in the <br />amount of $346,398.97 and adoption of the Notice of Completion by City Council. Subsequent to <br />filing the Notice of Completion by the City, final payment (retained amount) is due after the lien <br />period of thirty-five (35) days. Our records indicate the $311,759.07 has been paid to Albert W. <br />Davies, Inc. by the City, leaving a final payment of $34,639.90 (10% retention) per the attached <br />Payment Request No. 6 - Final. Please verify this amount prior to releasing final payment after the <br />lien period. Also attached are release forms executed by the Contractor and Yeomans Chicago <br />Corporation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.