My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1992 AGN MAY 19 I22
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1992
>
1992 May 19 Agenda Packet
>
1992 AGN MAY 19 I22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:22:10 AM
Creation date
2/20/2014 7:17:47 PM
Metadata
Fields
Template:
General Documents
Created By
jshook
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EX H 161T it A" <br />CITY OF COLTON <br />COST ESTIMATE FOR <br />2" OVERLAY, 1200 TONS AND 3" OVERLAY, 1900 TONS <br />March, 1992 <br />Based on 100,000 sq.ft., $28.50/ton asphalt, $.40/pulverized <br />PHASE AND LOCATION I SO. FT. <br />(AREA) <br />TONS ASPHALT j PULVERIZED <br />TOTAL <br />AREA I: LA CADENA TO Mfr' <br />VERNON <br />1,301,374 <br />24.719 <br />$704,491.50 <br />520.549.60 <br />$1,225,041.00 <br />AREA II: LA CADENA TO SP <br />RAILROAD TO NORTH CITY LIMITS <br />2,569,535 <br />49,735 <br />$1.417.447. <br />1,027,814.00 <br />$2.445,261.50 <br />AREA III: SOUTH OF I-10. SANTA <br />ANA RIVER WEST TO CITY LIMITS <br />1.331.955 <br />25,289 <br />$720,736.50 <br />532,782.00 <br />$1.253,518.50 <br />AREA IV: EAST OF MT. VERNON <br />SOUTH OF GRANT TO VALLEY <br />1,142.330 <br />21.698 <br />$618.393.00 <br />456.932.00 <br />$1,075.325.00 <br />AREA V: COOLEY RANCH SOUTH OF <br />I-10, EAST OF SANTA ANA RIVER <br />672.858 <br />12,768 <br />$383.888.00 <br />269,143.20 <br />$651,031.20 <br />SUBTOTAL <br />$5.755.896.00 <br />15% CONTINGENCY (I.E. ADJUST, <br />S, GATE VALVES. <br />STRIPING) <br />5863,384.00 <br />TOTAL <br />$6.619.280.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.