Laserfiche WebLink
�i Barton Road/ Cool ey-Dr'%i9-,WWashington Street modification to provide <br />a southbound traffic signal indication. Mojave Drive and Washington <br />Street 3M programmed visibility head eastbound, left safety and <br />legal ramifications. <br />Cost: $10,000 <br />�2. Traffic <br />signal <br />detection for: <br />(a) Mt. <br />Vernon <br />Avenue and Grant Street - loops <br />$15,000 <br />(b) Mt. <br />Vernon <br />Avenue and Valley Boulevard - rewire <br />$30,000 <br />(c) Mt. <br />Vernon <br />Avenue and Valley Boulevard - loops <br />$16,500 <br />Needed for more efficient operation of the intersection traffic. <br />Cost: $61,500 <br />3. Rancho Avenue and Valley Boulevard installation to protect new loops <br />by overlay of intersection. Needed for more efficient operation of <br />the intersection traffic. <br />Cost: $30,000 <br />4. Install City owned four illuminated intersection street signs for <br />South La Cadena Drive and "N" Street. <br />Cost: $4,000 <br />V 5. Install new signal installation at Fairview Drive and Colton Avenue. <br />Cost: $85,000 (includes field engineering services) <br />6. Provide funding for PSE and construction for Washington Street <br />widening east of Bluff Road and Barton Road/Cooley Drive. Needed to <br />provide through traffic lanes to meet capacity requirements. <br />cost. $60,000 Construction: $296,000 <br />7. Pepper Avenue widening already approved by Council. Consulting <br />services to prepare PS&E for project. <br />Cost: $50,000 Construction: $296,000 (Unfunded) <br />