My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1993 AGN MAR 16 I03
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1993
>
1993 March 16 Agenda Packet
>
1993 AGN MAR 16 I03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 9:46:15 PM
Creation date
2/20/2014 7:43:01 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATION <br />15 GALLON TREES <br />URBAN FORESTRY PROJECT <br />GENERAL: <br />This specification is for an estimated 626, FIFTEEN (15) <br />GALLON trees to be planted in the <br />City of Colton under an <br />Urban Forestry Grant. In addition, a part of the supplies <br />needed for this project is provided on this Bid Sheet. It is <br />the intention of the using department that the vendor store <br />the trees required in this bid. Delivery to the City will be <br />as required by, and in accordance <br />with the schedule as <br />determined by the project manager. <br />REQUIREMENTS: <br />UNIT 7.75% <br />QUAN DESCRIPTION <br />PRICE TAX AMOUNT <br />114 CREPE MYRTLE <br />$ 24.00 $ 212.04 $ 2948.04 <br />122 FERN PINE <br />$ 2400 $ 226.92 $ 3154.92 <br />54 BRISBANE BOX <br />$ 24.00 $ 100.44 $ 1396.44 <br />38 PURPLE LEAF PLUM <br />$ 24.00 $ 70.68 $ 982.68 <br />76 BRAZILLIAN PEPPER <br />$ 24.00 $ 141.36 $ 1965.36 <br />126 LONDON PLANE TREE <br />$ 24.00 $ 234.36 $ 3258.36 <br />67 BRADFORD PEAR <br />$ 24.00 $ 124.62 $ 1732.62 <br />29 QUEEN PALM <br />$ 24.00 $ 53.94 $ 749.94 <br />1252 CINCH TIES, ALL <br />RUBBER 24 INCH <br />NOT AVAILABLE <br />1252 LODGE POLES -EIGHT (8) <br />FOOT <br />NOT AVAILABLE <br />313 2 CFT . BAGS OF MULCH <br />NOT AVAILABLE <br />1000 FERTILIZER TABLETS <br />NOT AVAILABLE <br />TOTAL AMOUNT $ 16,188.36 <br />All trees must be of good quality. The project manager will <br />inspect all trees for acceptability for this project. The <br />project manager's decision is final as to acceptability. <br />
The URL can be used to link to this page
Your browser does not support the video tag.