Laserfiche WebLink
ta Ana Watershed Project Authority <br />6W <br />&%%n" Comm <br />ISAW7PA 000"COUWW"n obnwr <br />sMSWOMMVAUWUUMMWAM V01=1r <br />VVWMW"ftWATW=1ftO9 <br />Nmktcula <br />July 27, 1 <br />Mr. RaNd A. Lavin <br />Cly of Colton <br />060 N. La Cadena Drive <br />Colton, CA 92324 <br />Subjeab ASua Man" Road C11muro <br />Deer Mr. Lavin: <br />As you are amre, the SARI and RISC Projects are being corahFftd simultaneously by <br />PCL Civil Constructors, Inc. and Colich and Sons. Due to a recent chain of events, <br />which could not have been an#i *ated and wt*:h were not all results of the contractor's <br />decisions, the schedule along Aguas Mansa road is now required to be completed as the <br />first element of work. This change in schedule has elated much of the least time that <br />SAWPA had anticipated in requtatinq the road closure. <br />It it requested that road cure be considered on Agua Mansa Road for a period of <br />approximately 30 days beginning August 17, #trough September 17, 1994. <br />Thank you for your consideration in this matter. It would be my pleasure to attend the <br />City Council meeting to answer any questions. <br />Sincerely, <br />Lee E. Slate <br />Project Manager <br />cc: John C. Dutton <br />Rex Me!yom <br />CH2M Dill <br />Victor Pusac <br />1161S SWUM Avg, lbmdft CA 925M * (" 7Z 5_3411 <br />Ad=W0mftn FAX ('g09y 765.7076 9 P amftg FAX (9" 353-34Z2 Pr <br />