My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN DEC 06 I30
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 December 6 Agenda Packet
>
1994 AGN DEC 06 I30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2014 3:06:53 PM
Creation date
2/20/2014 7:37:32 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RELIANCE NATIONAL INDEMNITY COMPANY <br />PHILADELPHIA, PENNSYLVANIA <br />BID BOND <br />KNOW ALL MEN BY THESE PRESENTS, that we D& B E1 ectri c, I nc . <br />as Principal, hereinafter called the Principal, and the RELIANCE NATIONAL INDEMNITY COMPANY, a <br />Wisconsin corporation, as Surety, hereinafter called the Surety, are held and firmly bound unto <br />Ci ty of Col ton <br />as Obligee, hereinafter calfed the Obligee, in the sum of Ten PerCent of the Amount Bi d**** <br />payment of which sum well and truly to be made, the said PriDncipal and thef saiddSu et� f�bine <br />ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by <br />these presents. <br />WHEREAS, the Principal has submitted a bid for Constructi on of Approxi matel y 1. 3 <br />miles of 66KV Transmission line, <br />Using Both Wood and Steel Poles <br />NOW, THEREFORE, if the contract be timely awarded to the Principal and the Principal shall within <br />such time as specified in the bid, enter into a contract in writing and give bond with good and <br />sufficient surety, or, in the event of the failure of the Principal to enter into such Contract and give <br />such bond or bonds; if the Principal shall pay to the Obligee the difference not to exceed the penalty <br />hereof between the amount specified in said bid and such larger amount for which the Obligee may <br />in good faith contract with another party to perform the work covered by said bid, then this obligation <br />shall be null and void, otherwise to remain in full force and effect. <br />PROVIDED, HOWEVER, neither Principal nor Surety shall be bound hereunder unless Obligee prior to <br />execution of the final contract shall furnish evidence of financing in a manner and form acceptable to <br />Principal and Surety that financing has been firmly committed to cover the entire cost of the project. <br />Signed and sealed this 15th day of <br />d"'r /) A <br />�.,.., « . f / 6 <br />( ' ss> <br />. / <br />/� <br />BDP-2323 4/94 <br />November 19 94 <br />D & B Electric, Inc. <br />(Principal) <br />(Seal) <br />� <br />��%� .�°� , (il�'. `,�i � � .� ' ���17L�' <br />(Title) <br />��z�Cl.�`�� <br />��L'•� A IORiAL INDEMNITY COMPANY <br />�" <br />� <br />r� . G . Par k (Attorney-in-Fact) <br />
The URL can be used to link to this page
Your browser does not support the video tag.