My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1994 AGN FEB 01 I08
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1994
>
1994 February 01 Agenda Packet
>
1994 AGN FEB 01 I08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 4:03:22 AM
Creation date
2/20/2014 6:15:57 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- 1 <br />AGREEMENT <br />ARTICLE IV. The Notice Inviting Bids, Instruction to Bidders, <br />Proposal, Information Required of Bidder, the Faithful Perform- <br />ance Bond, the Labor and Material Bond, the General Conditions, <br />Special Provisions and Technical Specifications, Drawings, and all <br />Addenda issued by the City with respect to the foregoing prior to <br />the opening of bids, are hereby. designated the "Contract Docu- <br />ments" and are incorporated in and made part of this Agreement. <br />ARTICLE V. All time limits stated in the Contract Documents are <br />of the essence of this Agreement.. No work, services, materials or <br />equipment shall be performed or furnished under this Agreement un- <br />less and until a Notice to Proceed has been given to the Con- <br />tractor by the. City. City shall, with no liability to Contrac- <br />tor whatsoever, have an absolute right to withholddelivery of a <br />Notice to Proceed until the statute of limitations for challeng- <br />ing the, City's environmental review of this project has passed. <br />City shall, also with no liability whatsoever to Contractor, have <br />an absolute right to cancel this Agreement in the event that <br />litigation is filed against the City challenging the City's en- <br />vironmental review of this project. Notwithstanding the fore- <br />going, the City's said right to cancellation must be exercised not <br />later than 45 days following the bid opening date, and before <br />delivery of a Notice to Proceed to Contractor. <br />IN WITNESS WHEREOF, the parties hereto have caused this contract <br />to be executed as of the day and year first above written. <br />CITY O; CO ON <br />BY (Seal) <br />T i le Cit M nager <br />CONTRACTOR T,a±? e �nTest ern McCa1 ! a D? v <br />Title Assl taut General Manager <br />CONTRACTOR'S SIGNATURES MUST BE NOTARIZED AND THE NOTARY ACKNOW— <br />LEDGMENT MUST SPECIFY THAT THE SIGNER OF THE AGREEMENT IS AUTHOR <br />T ZED TO EXECUTE THE AGREEMENT. THE CITY'S ATTORNEY SHALL DETER- <br />MINE THE SUFFICIENCY OF CONTRACTOR'S SIGNATURES, AND MAY REQUIRE <br />NOTARIZED SIGNATURES FROM TWO OFFICERS IN THE EVENT THAT CONTRAC- <br />TOR IS A CORPORATION. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.