Laserfiche WebLink
EXHIBIT "B" <br />SCHEDULE OF WATER FEES <br />Development Fees: <br />1. Plan Check and Inspection — as a percentage of improvement cost <br />Cost of Improvement <br />A. Plan Check Fee $1.00 and over <br />4.0% <br />B. Inspection Fee $1.00 to $25,000 <br />4.5% <br />$25,001 to $100,000 <br />4.0% <br />$100,001 and over <br />3.5% <br />2. Additional engineering and construction costs for water facilities not being <br />installed prior to underground electric, telephone, gas, TV and etc: <br />Per water service connection or $60.00 <br />per foot, 60 foot minimum (whichever is greater) $ 1.00 <br />3. Connection Charges: <br />Full Service Connection (Meter Size) <br />A. 1" <br />B. 1 1/z" <br />C. 2" <br />D. Any meter larger than 2" is installed by the <br />contractor, plan checked, permitted and <br />inspected by the City <br />Meter and Box Only (Meter Size) <br />A. 3/4" <br />B. 1" <br />C. 1 1/2" <br />D. 2" <br />E. Any meter larger than 2" is installed by the <br />contractor, plan checked, permitted and <br />inspected by the City <br />$1250.00 <br />$1570.00 <br />$1780.00 <br />$100.00 <br />$170.00 <br />$325.00 <br />$440.00 <br />NOTE: THESE FEES ARE NOT BEING INCREASED, THEY ARE BEING <br />INCLUDED AS A PART OF THE ORDINANCE TO CREATE A <br />COMPREHENSIVE LISTING OF FEES. <br />