My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2010 RES R-70-10
Colton
>
CITY CLERK
>
City Council Resolutions
>
2001-2010
>
2010
>
2010 RES R-70-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2014 8:44:00 PM
Creation date
2/20/2014 8:11:20 PM
Metadata
Fields
Template:
General Documents
Created By
sespinoza
DocType
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />City of Colton <br />MEASURE "I" EXPENDITURE STATEGY <br />PLAN <br />A NARRATIVE <br />The City of Colton allocates sixty to seventy percent of its annual Measure I <br />revenue for system enhancement improvements to its street infrastructure. <br />Delivery of these improvements is focused on streets requiring extensive <br />alignment or capacity enhancement improvements. On occasion, the <br />sixtylseventy percent may be impacted when the City opts to utilize <br />Measure I funds to provide a grant funded project the required local match; <br />these projects would be focused on improving Colton's infrastructure <br />and/or transportation system for pedestrian/bicycielvehicular traffic. <br />The remaining thirty/forty percent of the City's annual Measure I allocation <br />will be allocated to streets exhibiting signs of stress. This street condition <br />can be remedied by providing a variety of maintenance applications such <br />as a slurry seal application to the stressed pavement. All identified <br />improvements are compliant with the goals of the city's General Plan <br />Circulation Element. <br />
The URL can be used to link to this page
Your browser does not support the video tag.