My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
R-091-18 Adopting the FY 18-19 Measure I Five Year Capital Improvement Plan and the Measure I expenditure Strategy Plans
Colton
>
CITY CLERK
>
City Council Resolutions
>
2011-2019
>
2018
>
R-091-18 Adopting the FY 18-19 Measure I Five Year Capital Improvement Plan and the Measure I expenditure Strategy Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2018 2:10:29 PM
Creation date
8/22/2018 2:09:33 PM
Metadata
Fields
Template:
City Clerk
Agenda Type
City Council
CC - Doc Type
Resolution
Date
8/7/2018
Resolution No.
R-91-18
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />City of Colton <br />MEASURE "I" EXPENDITURE STATEGY <br />PLAN <br />The City of Colton allocates approximately ninety percent (90%) of annual <br />Measure I revenue for system improvements to streets infrastructure. <br />Delivery of these improvements is focused on streets requiring rehabilitation <br />or safety enhancement improvements. Measure I funds are also being used <br />to provide local match for federal and state grant funded projects; these <br />projects are focused on improving Colton's infrastructure and/or <br />transportation system for pedestrian/bicycle/vehicular traffic. <br />The remaining ten percent (10%) of the City's annual Measure I revenue are <br />allocated to pedestrian safety such as sidewalk and handicap ramp <br />installation. All identified improvements are consistent with the goals of the <br />city's General Plan Circulation Element. <br />08/07/2018 Council Agenda 495 <br />
The URL can be used to link to this page
Your browser does not support the video tag.