My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
R-052-17 Establishing a High Voltage (66KV) Electric Rate
Colton
>
CITY CLERK
>
City Council Resolutions
>
2011-2019
>
2017
>
R-052-17 Establishing a High Voltage (66KV) Electric Rate
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2020 9:44:35 AM
Creation date
11/11/2020 9:34:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8, <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />EXHIBIT "A" <br />PROPOSED TEMPORARY ELECTRIC ENERGY RATES AND CHARGES FOR THE <br />COLTON ELECTRIC UTILITY (EFFECTIVE MAY 25, 2017) <br />[SEE ATTACHED ONE (1) PAGE TITLED: <br />"PROPOSED CURRENT COLTON ELECTRIC UTILITY RATE SUMMARY, WITH <br />HIGH VOLTAGE RATE <br />EFFECTIVE DATE: MAY 25, 2017" <br />23152.08 10 1 \8405361.1 <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.