My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
R-105-15 Adopt Measure I Capital Improvement Program for FY 2015-16 through FY 2019-20 and Expenditure Strategy Plan (9.1.15)
Colton
>
CITY CLERK
>
City Council Resolutions
>
2011-2019
>
2015
>
R-105-15 Adopt Measure I Capital Improvement Program for FY 2015-16 through FY 2019-20 and Expenditure Strategy Plan (9.1.15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2020 12:48:31 PM
Creation date
11/11/2020 12:43:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br />City of Colton <br />MEASURE "I" EXPENDITURE STATEGY <br />PLAN <br />The City of Colton allocates approximately seventy-five percent of annual <br />Measure 1 revenue for system improvements to streets infrastructure. <br />Delivery of these improvements is focused on streets requiring <br />rehabilitation or capacity enhancement Improvements. Measure I funds are <br />also being used to provide local match for federal and state grant funded <br />projects; these projects are focused on Improving Colton's infrastructure <br />and/or transportation system for pedestrian/bicycle/vehicular traffic. <br />The remaining twenty-five percent of the City's annual Measure I revenue <br />are allocated to traffic safety such as traffic sign installation/replacement, <br />striping and traffic signal upgrade. All identified improvements are <br />consistent with the goals of the city's General Plan Circulation Element. <br />
The URL can be used to link to this page
Your browser does not support the video tag.