Laserfiche WebLink
Please do not change, alter or modify this template. <br />MEASURE I LOCAL STREET PASS-THROUGH FUNDS FIVE YEAR CAPITAL IMPROVEMENT PLAN <br />PLAN PERIOD: <br />2013/2014 to 2017/2018 <br />RESOLUTION APPROVAL DATE: <br />Od.15, 2013 <br />CONTACT PERSON & TITLE: <br />Vidor Ortiz, P.E./ Engineering Manager <br />CONTACT PHONE: <br />(909) 370-5065 <br />CONTACT EMAIL: <br />vortiz@cI.cohon.ca.us <br />AGENCY NAME: <br />City of Colton <br />FY 2013/2014 <br />FY 2014/2015 <br />FY 2015/2016 <br />FY 2016/2017 <br />FY 2017/2018 <br />Total Available <br />(Canyoverplus <br />estimate <br />CARRYOVER BALANCE: <br />$1,283,719.17 <br />MEASURE I ESTIMATE: <br />$788,884.70 <br />$812,551.24 <br />$836,927.78 <br />$862,035.61 <br />$887,896.68 <br />$5,472,015.18 <br />Named Projects: <br />Estimated Total Nexus Project? <br />Project Cost Public DIF <br />Share(%) sh..(%) <br />FY 2013/2014 <br />Carryover Current <br />Funds Estimate <br />FY 201412015 <br />Carryover Current <br />Funds Estimate <br />FY 2 01 512 01 6 <br />Carryover Current <br />Funds Estimate <br />FY 2 01 612 01 7 <br />Carryover Current <br />Funds Estimate <br />FY 201712018 <br />Carryover Curtent <br />Funds ESOmate <br />Total Local Street <br />Measure I <br />Programmed <br />Colton Crossing - Laurel Grade Separation <br />$ 55,349,000.00 <br />$ 1,104 514.17 $ <br />53,122.00 <br />- <br />$0.00 <br />$1 157 636.17 <br />Bride Retrofit - Track over Cadens Drive <br />$ 130,000.00 <br />$ <br />62 000.00 <br />$ 50,000.00 <br />$112,000.00 <br />it <br />Bridge Retrofit - La Cadens Or. 8 Wilson Elem POC <br />e Ca <br />$ 130 000.00 <br />$ <br />62,000.00 <br />$ 50 000.00 <br />$112,000.00 <br />Bridge Retrofit - Mt. Vernon Ave. over Santa Ana River <br />$ 621 494.00 <br />$ <br />62,000.00 <br />$ 50,000.00 <br />$112,000.00 <br />Bride Retrofit - UPRR Track over C Street <br />$ 130 000.00 <br />$ <br />62,000.00 <br />$ 50,000.00 <br />$112,000.00 <br />Bridge Retrofit - BNSF Track over C Street <br />$ 195 000.00 <br />$ <br />62 000.00 <br />_ <br />$ 50,000.00 <br />$112,000.00 <br />Bride Retrofit - Colton High POC at Rancho Avenue <br />$ 124,600.00 <br />$ <br />62,000.00 <br />$ 50,000.00 <br />$112,000.00 <br />Barton Bridge Replacement Project <br />$ 3,243.075.00 <br />$ 32,090.00 <br />$ 86,552.00 <br />$ 150,000.00 <br />$ 100,000.00 <br />$368,642.00 <br />Mt. Vernon Bridge over UPRR WideningProject <br />-River <br />$ 10,961,800.00 <br />$ 145,000.00 <br />$ 150000.00 <br />$ 200,000.00 <br />$495,000.00 <br />La Cadena Bridge over Santa Ana Replacement Project <br />$ 27 535 000.00 1 <br />$ 100,000.00 <br />$ 150 000.00 <br />$ 200,000100 .00 <br />$450,000.00 <br />South Colton Drainage Project <br />$ 266667.00 <br />$ 40,000.00 <br />$40,000.00 <br />Wahin ton St./Reche Canyon Intersection Improvement CMAQ <br />$ 400 000.00 <br />$ 52,774.00 <br />$52,774.00 <br />Mt. Vernon Avenue Corridor Traffic Signal Improvement <br />$ 770 000.00 <br />$ <br />77,000.00 <br />$77,000.00 <br />Washin ton Street Extension <br />$ 1 500 000.00 <br />$ 54 341.00 <br />$54,341.00 <br />Pavement Rehabilitation - Washington Street Mt. Vernon to Waterman <br />$ 415 000.00 <br />$ 50,000.00 <br />$ 150 000.00 <br />$ 215,000.00 <br />$415,000.00 <br />Pavement Rehabilitation - Rec_he Canygn Road Shane Dr. to 750 Fl. North <br />$ 122 000.00 <br />$ <br />122,000.00 <br />$122,000.00 <br />Pavement Rehabilitation - Mt. Vernon Avenue Olive Sl. to City Limit <br />$ 360 000.00 <br />$ <br />100,000.00 <br />$ 260,000.00 <br />_ _ <br />$360,000.00 <br />Pavement Rehabilitation - Rancho Avenue (Valley Blbd. to UPRR Bridge) <br />$ 110,000.00 <br />$ 110,000.00 <br />$110,000.00 <br />Pavement Rehabilitation - Iowa Avenue 1-215 Project Limit to Main Street <br />$ 150 000.00 <br />$ 150,000.00_ <br />$150,000.00 <br />Pavement Rehabilitation - Hunts Lane (Washington St. to Moutainwoods St. <br />$ 180 000.00 <br />$ 180,000.00 <br />_ _ <br />$180,000.00 <br />Citivirde Slurry Seal Project <br />$ 470,000.00 <br />$ 120,000.00 <br />$ 150,000.00 <br />$ 200,000.00 <br />$470,000.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Named Projects Total: <br />$ 103,163,636.00 <br />$ 1,283,719.17 $ <br />724,122.00 <br />$ $ 766,552.00 $ <br />$ 775,000.00 <br />$ $ 810,000.00 $ <br />$ 815,000.00 <br />$5,174,393.17 <br />Total Ca ver+Estimate: <br />$ 5174,393 <br />$2,007,841.17 <br />$766,552.00 <br />$775,000.00 <br />$810,000.00 <br />$815,000.00 <br />$5174393.17 <br />% Named Projects: <br />255% <br />94% <br />93% <br />94% <br />92% <br />Total *: <br />762.70 <br />(`) = Carryover funds may not be used on Catergoncal Projects. <br />In Accordance with Measure I Strategic Plan Policy 40003: <br />1. If Measure I allocated to project is x$100,000, then list Individually in Named Projects section. <br />2. There is a 50% limit on total categorical projects. <br />3. There is a 150% constraint on total planned expenditures to Measure I estimated revenue. <br />4. Expenditures of Measure I Local Street funds must be detailed in the Five Year Capital Improvement Plan and adopted by resolution of the governing body. <br />5. Revised Capital Improvement Plans are due to SANBAG by the end of the fiscal year along with the resolution. <br />RESOLUTION NUMBER: <br />R-80-13 <br />RESOLUTION APPROVAL DATE: <br />Od.15, 2013 <br />CONTACT PERSON & TITLE: <br />Vidor Ortiz, P.E./ Engineering Manager <br />CONTACT PHONE: <br />(909) 370-5065 <br />CONTACT EMAIL: <br />vortiz@cI.cohon.ca.us <br />R -IA -D.. SnII U tort <br />45,999.24 <br />Total Programmed: $ 5,472,015.18 <br />Total Carryover Programmed: $ 1,283,719.17 <br />Total Estimated Programmed: $ 4,188,296.01 <br />Check: $ 5,472,015.18 <br />150% of Estimated Measure I plus carryover: $ 6,282,444.02 <br />Does programing amount exceed 150% limit: No <br />