My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
O-003-15 Amend Tile 18 Zoning (3.3.15)
Colton
>
CITY CLERK
>
City Council Ordinances
>
2000s
>
2011-2021
>
2015
>
O-003-15 Amend Tile 18 Zoning (3.3.15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2020 4:42:48 PM
Creation date
11/11/2020 4:42:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />Where: <br />S = Averaee natural slope in percent. <br />I = Contour interval in feet, at not more than 10 foot intervals, resulting in at least five <br />contour lines being shown on the contour may. <br />L = The sum of the length of all the contour lines across the parcel in scale feet. See <br />Fieure 1 below. <br />A = The gross area of the building site in square feet. <br />I,....._' mot•..' <br />Lbn_.. <br />conioa <br />'� ..`en�h��rtattflnnr <br />r"` ; •I <br />I �Lano�n�rwnwur_a�..-�' i <br />Street <br />Figure 1. Measurement of Contour Line Length to <br />Determine "L" in Slope Formula <br />Average Slope Formula: S = 100 (I s L) A <br />18.041.025 Permit and Application Requirements. <br />1. Development that is subiect to this Section shall require an Architectural and Site <br />Plan Approval by the Plannine Commission subiect to this Title. The application shall <br />include: <br />A. Basic application contents. All information and materials required <br />by Section 18.53.030 (Application Preparation and Filing), and all additional materials <br />required by the application contents handout provided by the Development Services <br />Department for hillside development, and <br />B. Geotechnical report. A preliminary geotechnical report that <br />identifies and proposes mitigation measures for any soils or eeoloeical problems that <br />may affect site stability or structural integrity. Depending upon the site characteristics <br />and_proiect design, a final geotechnical report may also be required as part of a <br />subsequent Building Permit application. <br />C. Constraints analysis. For properties that have sensitive <br />environmental resources including endangered plants and animals drainage feature, or <br />a wildlife corridor designated by the City, a qualified professional approved by the <br />Director shall prepare a site constraints analysis. The report shall include proposed <br />mitigation measures to effectively protect important identified biological features. <br />18.041.030 Development Standards. <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.