Laserfiche WebLink
<br /> 1 <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 <br /> 26 <br /> 27 <br /> 28 <br />“15.58.040 Construction and Demolition Recycling Requirements. <br />The construction and demolition requirements specify recycling or deconstruction for reuse in the <br />removal, remodeling or new construction of any structure on the site. The construction and <br />demolition recycling plan shall include the following: <br />A. Loading and Collection Area Drawing: The construction and demolition recycling plan shall <br />include a drawing that identifies an area for the loading and collection of recyclable materials <br />with appropriate access for collection vehicles. <br />B. Targeted Materials for Recycling: Targeted materials for recycling shall include concrete, <br />asphalt, clean wood (unpainted or untreated), brick, metal, cardboard and sheetrock. The <br />municipal utilities director may modify the targeted materials based on available markets. <br />C. Separation of Materials: The demolition and construction plan shall specify how the materials <br />will be separated at the source and/or recycled by utilizing the services of a processor. <br />D. Plan Compliance: The Construction & Demolition (C&D) program shall demonstrate <br />compliance with the following construction site requirements: <br />1. Construction waste and demolition debris shall be removed from the construction site on a <br />regular basis and shall not be stored on site and in the open for a period in excess of four (4) <br />weeks, provided that such waste is not hazardous or noxious and does not constitute a <br />nuisance, in which case it must be appropriately secured and regularly removed from the <br />construction site. <br />2. Reasonable efforts shall be demonstrated to provide for segregation of recyclable <br />construction materials and demolition debris for diversion from landfills. <br />3. Construction waste and demolition debris that may become windblown shall be <br />containerized to prevent litter. <br />E. Recycled Materials: Recycled materials to be used in construction or remodeling of the facility <br />shall be identified. <br />F. Approved Demolition Permit and Building Permit: No demolition permit or building <br />permit shall be issued for any development activity subject to this chapter unless the construction <br />and demolition diversion program plan has been approved by the Building Official. <br /> <br />5