Laserfiche WebLink
1 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />70 <br />21 <br />")I? <br />2j <br />24 <br />25 <br />26 <br />27 <br />28 <br />RESOLUTION NO. R-1111-21 <br />APPROVE EMERGENCY CONTRACT IN ACCORDANCE WITH <br />COLTON MUNICIPAL CODE SECTION §3.08.130(A) FOR EMERGENCY <br />REPAIRS TO T2 AT THE CENTURY SUBSTATION. <br />WHEREAS, on August 4, 2021 Century Substation Transformer No. 2 was vandalized <br />by a stray bullet causing an oil leak, and the Transformer was de -energized; and <br />WHEREAS, on August 18, 2021 Transformer No. 1 tripped off due to low oil level; and <br />WHEREAS, the City Manager declared that an emergency existed and authorized the <br />repairs to Transformer No. 2, without a customary bidding process; <br />WHEREAS, in compliance with the requirements of the Public Contract Code and the <br />City's Municipal Code, Sections 3.08.130(a), City Council must ratify approval of the emergency <br />repair of Transformer No. 2 at the Century Substation without a formal bid process; <br />WHEREAS, the intermediate repair start on September 1, 2021; and <br />WHEREAS, this intermediate repair will allow the Transformer to be re -energized and <br />placed back into service create a more stable system in the area and reduce outage risks for the <br />rest of the summer until the permanent repair work can be completed. <br />23152.06020\32617662.1 <br />