My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 060606 Harris Construction - Storm Drain project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
06/06/2006 06:00 PM
>
CONSENT CALENDAR
>
Award of Construction Contract/Harris Construction
>
AR 060606 Harris Construction - Storm Drain project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 7:08:28 PM
Creation date
2/19/2014 10:14:54 PM
Metadata
Fields
Template:
Agenda Item
Item Number
12
Subject (2)
- Approve and Adopt a Resolution Deleting 3-5 Comprehensive Storm Drain Project Phase I from the Capital Improvement Program and Adding 3-5 Comprehensive Storm Drain Project Phase III, thus Redirecting the Available Funding for Phase I to Phase III of the Project; Approve and Adopt a Resolution Increasing the Capital Improvement Program Budget by $600,000, and Approve the Award of Contract for Comprehensive Storm Drain Project - Phase III to Harris Construction Engineering, Inc. as the Lowest Responsive and Responsible Bidder in the Amount $2,019,411, RESOLUTION NOS. R-66-06.
Submitted On
6/1/2006
Submitted By
Sabdi Espinoza
Item Title
AR 060606 Harris Construction - Storm Drain project
ATRequest
850
Status (2)
2
Department
City Clerk
Meeting Date
6/6/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECORDING REQUESTED BY <br />AND WHEN RECORDED MAIL TO <br />Name: City of Colton <br />Street 650 N. La Cadena Drive <br />Address <br />City & Colton, California <br />State California <br />Zip 92324 <br />Recorded in Official Records, County of San Bernardino <br />9/13=7 <br />LARRY WALKER <br />M P" <br />Auditor/Controller — Recorder <br />R Regular Mail <br />Dock 2007-0158633 Telles: 1 <br />Images: 1 <br />ant <br />Fees <br />0.00 <br />Taxes <br />0•� <br />Other1111111111111111111111 <br />PAID <br />00•� <br />SPACE ABOVE THIS LINE FOR RECORDER'S USE <br />Notice of Com <br />NOTICE IS HEREBY GIVEN THAT: <br />1. The City of Colton is the owner of the interest or estate stated below in the property hereinafter described. <br />2. The full name of the undersigned is Amer Jakher, P.E <br />3. The full address of the undersigned is 650 y a Cadena Drive, Colton, CA 92324 <br />4. The nature of the title of the undersigned is City of Colton Public Works t}irector/City Engineer <br />(E.G. owner in fee OR vender under contract of purchase OR lessee OR OTHER APPROPRIATE DESIGNATION). <br />5. The full names and full addresses of all persons, if any, who holds title with the undersigned as joint tenants <br />or as tenants in common are: <br />Names Addresses <br />N/A N/A <br />6. The names of the predecessors in interest of the undersigned, if the property was transferred subsequent to <br />the commencement of the work of improvement herein referred to are (OR IF NO TRANSFER WAS <br />MADE, INSERT THE WORD "none"): <br />Names Addresses <br />N/A N/A <br />7. A work of improvements on the property hereinafter described was completed on February 2. 2007 <br />8. The name of the original contractor, if any, for the work of improvement was Harris Construction Engineering, Inc. <br />The kind of work done or material furnished was installation of 2.016 lineal feet of 108" reinforced concrete pipe along <br />Valley Boulevard from Meridian Avenue to Cypress Avenue. <br />9. The property on which the work of improvement was completed is in the City of Colton, <br />County of San Bernardino, State of California, and is described as follows: 3-5 Comprehensive Storm Drain Project <br />Phase III. <br />10. The street address of the said property is along Valley Boulevard from Meridian Avenue to Cypress Avenue, Colton. <br />CA -02-524. <br />Dated: 3 (Signature) <br />Amer Jakher, Public Works Director/City Engineer <br />VERIFICATION <br />I, the undersigned say: <br />I am the person who signed the foregoing notice. I have read the above notice and know its contents, and the facts stated <br />therein are true of my own knowledge. <br />I declare under penalty of perjury that the foregoing is true and correct. <br />Executed at Co (4--1 wn , California, this day of ,cLA <br />(SIGNATORE) <br />
The URL can be used to link to this page
Your browser does not support the video tag.