My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 061806 bids
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
07/18/2006 6:00 pm
>
CONSENT CALENDAR
>
Bids
>
AR 061806 bids
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 7:11:34 PM
Creation date
2/19/2014 10:19:16 PM
Metadata
Fields
Template:
Agenda Item
Item Number
19
Subject (2)
- Authorize Request to Solicit Bids for the Agua Mansa Road Widening and Realignment Project.
Submitted On
7/13/2006
Submitted By
Sabdi Espinoza
Item Title
AR 061806 bids
ATRequest
925
Status (2)
2
Department
City Clerk
Meeting Date
7/18/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #23 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF JULY 18, 2006 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: AUTHORIZE REQUEST TO SOLICIT BIDS FOR THE AGUA <br />MANSA ROAD WIDENING AND REALIGNMENT PROJECT. <br />DATE: JULY 11, 2006 <br />BACKGROUND: <br />Several improvements will be made along Agua Mansa Road from the San Bernardino Flood <br />Control Channel to Riverside Avenue. The Agua Mansa Road Widening and Realignment Project <br />will address the planned improvements. The improvements include widening the road carriageway <br />to four twelve -foot lanes with a fourteen -foot median. The project will also align the Rialto <br />Channel with the existing channel crossing and a raised median will be constructed to better control <br />traffic's left tum movements from Riverside Avenue to the RIX Facility. Additionally, the project <br />will install curb, gutter and sidewalk along this portion of Agua Mansa Road. <br />ANALYSIS/DISCUSSION: <br />The design for this project has been completed by Engineering Resources of Southern California. <br />This project is now ready for construction. Engineering staff will prepare the necessary Plans, <br />Specifications and other documents necessary for the bidding process. Staff requests authorization <br />to solicit bids for the construction of the Agua Mansa Road Widening and Realignment Project. <br />ENVIRONMENTAL IMPACT: <br />The proposed public improvements are Exempt under Section 15301 (c) of the California <br />Environmental Quality Act (CEQA). <br />CONFLICT OF INTEREST <br />None. <br />
The URL can be used to link to this page
Your browser does not support the video tag.