My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 081506 malibu court storm drainage
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
08/15/2006 6:00 pm
>
CONSENT CALENDAR
>
Solicit Bids
>
AR 081506 malibu court storm drainage
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 7:48:45 PM
Creation date
2/19/2014 10:22:08 PM
Metadata
Fields
Template:
Agenda Item
Item Number
9
Subject (2)
- Approve and Adopt a Resolution Amending the Fiscal Year 2006/2007 Capital Improvement Program (CIP) to Increasing the Budget in the Amount of $170,000 for the Malibu Court Storm Drainage Improvement Project and Authorize Request to Solicit Public Bids for Malibu Court Storm Drainage Improvement Project, RESOLUTION NO. R-119-06.
Submitted On
8/10/2006
Submitted By
Sabdi Espinoza
Item Title
AR 081506 malibu court storm drainage
ATRequest
996
Status (2)
2
Department
City Clerk
Meeting Date
8/15/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ITEM #14 <br />CITY OF COLTON <br />AGENDA REPORT <br />I+'OR THL UITY UOUINUIL MLEI11NU OF AUUUNI 1-N. LUUO <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: APPROVE RESOLUTION AMENDING THE FISCAL YEAR <br />2006/2007 CAPITAL IMPROVEMENT PROGRAM (CIP) TO <br />INCREASING THE BUDGET IN THE AMOUNT OF $170,000 FOR <br />THE MALIBU COURT STORM DRAINAGE PROJECT AND <br />AUTHORIZE REQUEST TO SOLICIT PUBLIC BIDS FOR MALIBU <br />COURT STORM DRAINAGE IMPROVEMENT PROJECT. <br />DATE: AUGUST 7, 2006 <br />BACKGROUND: <br />Most of the surface run-off along Reche Canyon Road (from Shadid Drive to Topanga Road) <br />runs into a concrete catch basin located on the west side -north of Topanga Road. At Topanga <br />Road and Malibu Court the run off water bubbles up and becomes surface flow. This water <br />drains into a catch basin with a 48" diameter pipe that connects to the Reche Canyon Channel. <br />Heavy rains throughout the year cause debris and mud to collect in the catch basin and along <br />Malibu Court. As a result, this area is prone to flooding. The absence of curb and gutter on the <br />east side of Reche Canyon Road add to the existing concern. <br />To address the above mentioned problem, the Capital Improvement Program for fiscal year <br />2006/2007 included the Malibu Court Drainage Improvement Project. However, the original <br />scope of work has been expanded to include installation of a 42" and 48" diameter reinforced <br />concrete pipe (RCP), rather than 18", and catch basin on the east of Reche Canyon Road; this is <br />shown on the attached Exhibit A. <br />ANALYSIS/DISCUSSION: <br />Engineering staff prepared the plans, specifications, and estimate for this Project and the Project <br />is now ready to commence the bidding process. To ensure a wide range of potential bidders are <br />reached by the advertising process the City will advertise in local newspapers and `plan houses' <br />where contractors can view the Project's: plans, specifications and documents. This procedure is <br />compliant to the process depicted by the City's purchasing ordinance 0-12-03, Section 3.08.090 (d) <br />and 3.08.090 (e). <br />
The URL can be used to link to this page
Your browser does not support the video tag.