My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AR 100306 3-5 Comprehensive storm drain project
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2006
>
10/03/2006 6:00 pm
>
CONSENT CALENDAR
>
3-5 Comprehensive Storm Drain Project
>
AR 100306 3-5 Comprehensive storm drain project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 8:05:18 PM
Creation date
2/19/2014 10:27:09 PM
Metadata
Fields
Template:
Agenda Item
Item Number
12
Subject (2)
- Authorization to Submit an Application to the San Bernardino County Flood Control District requesting Funding for Phase I and Phase II of the 3-5 Comprehensive Storm Drain Project.
Submitted On
9/28/2006
Submitted By
Sabdi Espinoza
Item Title
AR 100306 3-5 Comprehensive storm drain project
ATRequest
1079
Status (2)
2
Department
City Clerk
Meeting Date
10/3/2006
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />FOR COUNCIL MEETING OF OCTOBER 3, 2006 <br />TO: HONORABLE MAYOR AND CITY COUNCIL <br />FROM: AMER JAKHER, P.E.,P.W. DIRECTOR / CITY ENGINEER <br />SUBJECT: AUTHORIZE THE PUBLIC WORKS DEPARTMENT TO SUBMIT AN <br />APPLICATION TO THE SAN BERNARDINO COUNTY FLOOD <br />CONTROL DISTRICT REQUESTING FUNDING FOR PHASE 1 AND <br />PHASE 2 OF THE 3-5 COMPREHENSIVE STORM DRAIN PROJECT. <br />DATE: SEPTEMBER 26, 2006 <br />BACKGROUND: <br />The San Bernardino County Flood Control District (SBCFCD) is responsible for flood control <br />functions throughout the County of San Bernardino. These functions include the development <br />and maintenance of: dams, conservation basins, and storm drain channels. The purpose of <br />ongoing and proposed improvements overseen by SBCFCD is to intercept and direct flood flows <br />away from major developed areas of the County. In 1973, a conceptual plan was developed <br />identifying improvements that would provide the channeling system necessary to eliminate area <br />flooding in the westerly portion of Colton by providing collection systems and a conduit to the <br />Santa Ana River. This conceptual plan, the 3-5 Comprehensive Storm Drain Project, has since <br />been revised various times to ensure the project design would not disturb the nearby habitat of the <br />Delhi Sands Flower Loving Fly, an endangered species. This project has been phased into five <br />phases to make it financially feasible. <br />DISCUSSION/ANALYSIS: <br />The most recent cost analysis of this project establishes the current dollar costs at $21,024,000. <br />At this time Phase 3 is fully funded and is under construction. The City requests authorization to <br />submit a funding request to the San Bernardino County Flood Control District calling for a funding <br />allocation which would provide for the construction of Phase I and Phase 2. At this time the total <br />cost of construction for Phase 1 is $3,812,000. The total cost of construction for Phase 2 is <br />$5,610,000. The City of Colton has an available match of two million dollars and would propose <br />that the SBCFCD provide for the $7,422,000 needed to complete Phase I and 2. This funding <br />request will provide the needed infrastructure to County and City residents <br />FINANCIAL IMPACT: <br />The SBCFCD will notify the City if its funding request will be met in February 2007. The proposed <br />two million dollar match for Phase 1 and 2 of the 3-5 Comprehensive Storm Drain Project is <br />available in a combination of funding sources: development fees (fund 754), general fund reserve, <br />Measure I (fund 218), Gas Tax (fund 210) and Host City Fees (fund 240). If SBCFCD awards the <br />funding request to the 3-5 Comprehensive Storm Drain Project the Public Works Department staff <br />will bring a resolution to Council to budget the awarded funding and identify the City's specific <br />match allocation by funding source. <br />ENVIRONMENTAL IMPACT: <br />Not applicable. <br />7/10/03 City Clerk's Office Cb <br />
The URL can be used to link to this page
Your browser does not support the video tag.