Laserfiche WebLink
ITEM #13 <br />CITY OF COLTON <br />AGENDA REPORT <br />FOR THE CITY COUNCIL MEETING OF SEPTEMBER 4, 2007 <br />TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS <br />FROM: AMER JAKHER, P.E., PW DIRECTOR/CITY ENGINEER <br />SUBJECT: AWARD OPTIONAL BID ITEM VII (FAIRWAY DRIVE <br />WIDENING PROJECT) AS CHANGE ORDER NO.2 FOR CDBG <br />PROJECT #104-31105 AND 104-31305 IN THE AMOUNT OF <br />$41,637.48. <br />DATE: AUGUST 13, 2007 <br />BACKGROUND: <br />On September 19, 2006, a construction contract was awarded by Council for the following capital <br />projects: CDBG Project #104-31105/2765, CDBG Project #104-31305/2767, Safe Route to <br />School Project, Rancho Mill Redevelopment Projects, and Carreon Street Closure Project. The <br />construction agreement was awarded to the lowest responsive and responsible bidder to Portsmouth <br />Construction, in the amount of $676,566.10. Subsequently, on June 5, 2007 Council authorized <br />staff to award a change order to the contractor in the amount of $45,880.02. The compensation <br />reflected by the contract and change order totaled $722,446.12; the change order was resulted <br />from design changes required to install the project improvements. <br />The locations and specific improvements provided by each project are as follows: <br />I. CDBG Project <br />A. CDBG Project #104-31105/2765 — Installation of missing curb, gutter, <br />sidewalk, driveway approach and handicap ramps on Redlands Avenue (Olive <br />to Laurel Street), Lemon Street (Redlands to Mt. Vernon Avenue), Laurel <br />Avenue (Olive to Laurel Street), 10th Street (Olive to B Street), 12th Street (`C` <br />to `A' Street)., and B Street (10th Street to Colton Avenue). <br />B. CDBG Project #104-31305/2767 - Installation of missing curb, gutter, <br />sidewalk, and handicap ramps on Olive Street (Bordwell to La Cadena), <br />Bordwell (La Cadena to Olive), 9th Street (Olive to La Cadena), and 10th Street <br />(Olive to La Cadena). <br />11. Safe Route to School Project — Installation of missing curb, gutter, sidewalk, handicap <br />ramps, block wall, alley and driveway approach on Terrace Avenue (between C Street <br />and Olive Street) and Olive Avenue (between Pennsylvania Avenue and Rancho <br />Avenue). <br />