My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(11)AR 121807 AGMT Vargas Structures
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2007
>
12/18/2007 6:00 pm
>
CONSENT CALENDAR
>
Contract/Vargas Structures, Inc.
>
(11)AR 121807 AGMT Vargas Structures
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 5:24:14 AM
Creation date
2/19/2014 11:41:15 PM
Metadata
Fields
Template:
Agenda Item
Item Number
8
Subject (2)
- Authorize Award of a Construction Contract for the Veterans Park Restroom Project to Vargas Structures, Inc. as the Lowest Responsive and Responsible Bidder in the Amount of $241,760.
Submitted On
12/13/2007
Submitted By
Sabdi Espinoza
Item Title
AR 121807 AGMT Vargas Structures
ATRequest
1904
Status (2)
2
Department
City Clerk
Meeting Date
12/18/2007
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROVED BY <br />CITY C UNCIL <br />CONTRACT mater` <br />Item <br />THIS CONTRACT is made this 8th day of Januar , 2008, in the <br />County of San Bernardino, State of California, by and between the City of Colton, <br />hereinafter called City, and Vargas Structures Inc. , <br />hereinafter called Contractor. The City and the Contractor for the considerations stated <br />herein agree as follows: <br />ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the <br />time stipulated the Contract and shall provide all labor, materials, equipment, tools, utility <br />services, and transportation to complete all of the Work required in strict compliance with <br />the Contract Documents as specified in Article 5 below for the following Project: <br />VETERAN'S PARK RESTROOM PROJECT <br />The Contractor and its surety shall be liable to the City for any damages arising as a <br />result of the Contractor's failure to comply with this obligation. <br />ARTICLE 2. TIME FOR COMPLETION. The Work shall be commenced on the <br />date stated in the City's Notice to Proceed. The Contractor shall complete all Work <br />required by the Contract Documents within ninety (90) calendar days from the <br />commencement date stated in the Notice to Proceed. By its signature hereunder, <br />Contractor agrees the time for completion set forth above is adequate and reasonable to <br />complete the Work. <br />ARTICLE 3. CONTRACT PRICE. The City shall pay to the Contractor as full <br />compensation for the performance of the Contract, subject to any additions or deductions <br />as provided in the Contract Documents, and including all applicable taxes and costs, the <br />sum of Two Hundred Seventv One Thousand Seven Hundred and Sixtv Dollars <br />($ 271 760.00 Payment shall be made as set forth in the <br />General Conditions. <br />ARTICLE 4. LIQUIDATED DAMAGES. In accordance with Government Code <br />section 53069.85, it is agreed that the Contractor will pay the City the sum of $500.00 for <br />each and every calendar day of delay beyond the time prescribed in the Contract <br />Documents for finishing the Work, as Liquidated Damages and not as a penalty or <br />forfeiture. In the event this is not paid, the Contractor agrees the City may deduct that <br />amount from any money due or that may become due the Contractor under the Contract. <br />This Article does not exclude recovery of other damages specified in the Contract <br />Documents. <br />ARTICLE 5. COMPONENT PARTS OF THE CONTRACT. The "Contract <br />Documents" include the following: <br />CONTRACT <br />
The URL can be used to link to this page
Your browser does not support the video tag.