My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
(4)AR 020309 AGRMT Chrisp Company
Colton
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
2000 - 2009
>
2009
>
02/03/2009 6:00 pm
>
CONSENT CALENDAR:
>
Award of Contract/Chrisp Company
>
(4)AR 020309 AGRMT Chrisp Company
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2014 4:53:42 PM
Creation date
2/20/2014 12:21:02 AM
Metadata
Fields
Template:
Agenda Item
Item Number
4
Subject (2)
- Authorize Award of Construction Contract to the Lowest Responsible Bidder, Chrisp Company in the Amount of $75,000.00 for the Citywide Striping Project.
Submitted On
1/29/2009
Submitted By
Sabdi Espinoza
Item Title
AR 020309 AGRMT Chrisp Company
ATRequest
2608
Status (2)
2
Department
City Clerk
Meeting Date
2/3/2009
Meeting Time
6:00:00 PM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FA��F�Fi�3F3ITE' l IL <br />s Date <br />CONTRAC tern M <br />f '� 17 C FIV <br />13 <br />CHFISP C0.—FREMONT <br />THIS CONTRACT is made this 3rd day of February, 2009, in the County of San <br />Bernardino, State of California, by and between the City of Colton, hereinafter called City, and <br />CHRISP COMPANY, hereinafter called Contractor. The City and the Contractor for the <br />considerations stated herein agree as follows: <br />ARTICLE 1. SCOPE OF WORK. The Contractor shall perform all Work within the time <br />stipulated the Contract and shall provide all labor, materials, equipment, tools, utility services, <br />and transportation to complete all of the Work required in strict compliance with the Contract <br />Documents as specified in Article 5 below for the following Project: <br />CITY WIDE STRIPING PROJECT <br />VARIOUS LOCATIONS IN THE CITY OF COLTON <br />The Contractor and its surety shall be liable to the City for any damages arising as a result of the <br />Contractor's failure to comply with this obligation. <br />ARTICLE 2. TIME FOR COMPLETION. The Work shall be commenced on the date stated <br />in the City's Notice to Proceed. The Contractor shall complete all Work required by the <br />Contract Documents within forty five (45) calendar days from the commencement date stated in <br />the Notice to Proceed. By its signature hereunder, Contractor agrees the time for completion set <br />forth above is adequate and reasonable to complete the Work. <br />ARTICLE 3. CONTRACT PRICE. The City shall pay to the Contractor as full compensation <br />for the performance of the Contract, subject to any additions or deductions as provided in the <br />Contract Documents, and including all applicable taxes and costs, the sum of Seventy Five <br />Thousand Dollars and No Cents ($75,000.00). Payment shall be made as set forth in the <br />General Conditions. <br />ARTICLE 4. LIQUIDATED DAMAGES. In accordance with Government Code section <br />53069.85, it is agreed that the Contractor will pay the City the sum of $500.00 for each and every <br />calendar day of delay beyond the time prescribed in the Contract Documents for finishing the <br />Work, as Liquidated Damages and not as a penalty or forfeiture. In the event this is not paid, the <br />Contractor agrees the City may deduct that amount from any money due or that may become due <br />the Contractor under the Contract. This Article does not exclude recovery of other damages <br />specified in the Contract Documents. <br />ARTICLE 5. COMPONENT PARTS OF THE CONTRACT. The "Contract Documents" <br />include the following: <br />Notice Inviting Bids <br />Instructions to Bidders <br />Contractor's Bid Forms <br />
The URL can be used to link to this page
Your browser does not support the video tag.