Laserfiche WebLink
ro�' <br />CITY OF COLTON <br />INTEROFFICE MEMORANDUM <br />TO: Honorable Mayor and City Council <br />FROM: Thomas K. Clarke, Electric Utility Director/ Interim Water & Wastewater Director <br />SUBJECT: Water and Wastewater Master Plans <br />DATE: September 26, 1996 <br />The Water and Wastewater Utilities are in the process of revising the'Water and Wastewater <br />Master Plans for the City of Colton. The Water Master Plan is being prepared by Krieger & <br />Stewart and is essentially an update of the 1991 Master Plan which has previously been <br />approved. Kennedy -Jenks is preparing the Wastewater Master Plan for the City. Staff has <br />been working with both of these consultants to supply them the proper information for their <br />evaluation and recommendation of system changes and improvements which need to be <br />undertaken by the Water and Wastewater Utilities. <br />Both of these consultants have indicated that a draft report for both Water and Wastewater <br />master plans should be available within the next three months. Once these are submitted, <br />staff will review and make appropriate changes before the final report will be issued. Once a <br />draft is available, it can be distributed to the Utilities Commission and the City Council for <br />preliminary consideration. Final adoption of the plans will not take place until finals are <br />received, reviewed, and presented to the two bodies. The consultants have not indicated that <br />additional information is necessary for them to complete their studies, however, staff works <br />closely with the consultants to determine any ongoing changes that need to be included as the <br />process moves along. <br />TKC:csk <br />cc: Interim City Manager Freeman <br />Assistant City Manager Parrish <br />ITEM 13 <br />