Laserfiche WebLink
. CITY OF COLTON <br />AGENDA REPORT <br />6eaX91 F <br />For City Council Meeting of -44996 <br />TO: HONORABLE MAYOR 8 CIN COUNCIL <br />APPROVAL: HENRY GARCIA, CITY MANAGE <br />FROM: JOHN C. HUTTON, PUBLIC WORKS DIRECTO <br />SUBJECT: FINAL ACCEPTANCE/NOTICE OF COMPLETION FOR THE CFD 89-1 <br />COOLEY DRIVE AND WASHINGTON STREET LANDSCAPE MEDIANS PROJECT <br />DATE: NOVEMBER 5, 1998 <br />BACKGROUND: <br />Per City Council approval on April 7, 1998, the contract for this project was awarded to Sean Malek <br />Engineering & Construction, Inc., in the amount of $45,841.00. <br />The Contractor has completed the project, and the final punch list has been completed and approved. A <br />one year Guarantee on the Project has been signed & submitted by Sean Malek Enginnering & <br />Construction. The Stamped Concrete portion of this project has been completed by City Forces. <br />DISCUSSION/ANALYSIS: <br />Prior to completion of the contract, there were problems encountered in the field for the Washington <br />Street portion of the project: additional trenchwork and 2 additional valves were required. This portion of <br />the work was performed by City Forces as it was not a part of the original contract and there were no <br />additional monies available from the CFD 89-1 funding source. <br />In addition, City Forces have contracted to have a Booster Pump installed to combat a water pressure <br />problem which is affecting both of the large medians on Washington Street. The pump is scheduled to <br />be installed the week of November 10, 1998; portions of the sod area which were damaged as a result of <br />the water pressure problem have been re -seeded. <br />FINANCIAL IMPACT: <br />This project is funded by CFD 8-1 Assessment District funds. The total amount of the contract awatded <br />to Sean Malek Construction & Engineering, Inc. is $45,841.00. There were no change orders for this <br />portion of the Contract. <br />RECOMMENDATION: <br />■ Staff recommends final acceptance of the CFD 89-1 Cooley Drive & Washington Street Landscape <br />Medians Project in the amount of $45,841. Staff further recommends that City Council authorize <br />finalizing a Notice of Completion for the portion of the project performed by Sean Malek Construction <br />& Engineering, Inc. <br />■ Staff recommends that Council approve the execution and recordation of this document. <br />jch/dst <br />Page 1 of 1 Item NO. 2 <br />