My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
1998 AGN MAR 03 I11
>
CITY CLERK
>
City Council Agendas
>
Agenda Packets
>
1990 - 1999
>
1998
>
1998 March 03 Agenda Packet
>
1998 AGN MAR 03 I11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 11:23:19 PM
Creation date
2/20/2014 2:13:17 PM
Metadata
Fields
Template:
General Documents
Created By
avillalba
DocType
General Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF COLTON <br />AGENDA REPORT <br />Council Meeting of March 3, 1998 <br />TO: Honorable Mayor and Council Members <br />APPROVAL: Henry T. Garcia, City Manage <br />FROM: Daryl J. Parrish, Assistant City Manager <br />SUBJECT: Approval of Aman Environmental Construction Contract Change <br />Orders for Street, Storm Drain, Intersection, and Landscaping <br />Improvements Surrounding the Arrowhead Regional Medical <br />Center Totaling $53,984 <br />DATE: February 24, 1998 <br />BACKGROUND: <br />Four small change orders to the Aman Environmental Construction Contract for the <br />Street, Storm Drain, Intersection, and Landscaping Improvements surrounding the <br />Arrowhead Regional Medical Center are required for the reasons described below. <br />DISCUSSION/ANALYSIS: <br />Change Order #1 $3,387 <br />Installation of one inch air vacuum assembly on San Bernardino Avenue. <br />Change Order #2 $5,293 <br />For asphalt, barricades, traffic delineators, signage, flashers and labor for modifications <br />to the edge of roadway at the southwest comer of Pepper and San Bernardino <br />Avenues. <br />Change Order #3 $28,314 <br />Provides for a left turn at driveway located on the West Side of Pepper Avenue to <br />accommodate northbound truck traffic into commercial property (McNelius Trucking). <br />Change Order #4 $16,990 <br />For the relocation and reconstruction of RCP storm drain lines, the relocation of <br />manholes and the replacement of a fire hydrant due to conflict with storm drain lateral. <br />FISCAL IMPACT: <br />The aforementioned change orders are to be funded via an advance from the County of <br />San Bernardino as per the Medical Center MOU. The advancement of funds will be <br />repaid to the County (without interest) from fees paid by future development as their <br />part towards the mitigation of traffic impacts and storm drainage. <br />ITEM #11 <br />it <br />
The URL can be used to link to this page
Your browser does not support the video tag.